Planning Permission Ireland
GrantedExtensionDecided 13 July 2023

44, Glenabbey Road, Mount Merrion, Blackrock, Dublin, A94E6T3

Demolition of existing extensions and construction of new ground and first-floor extensions in Mount Merrion.

D23A/0346 · Dun Laoghaire Rathdown County Council · Lodged 24 May 2023

Reference
D23A/0346
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
24 May 2023

Summary

AI-generated

The project involves removing an existing single-storey rear extension and a side garage/utility. A new ground and first-floor extension will be built to the side and rear, increasing the floor area by 88.9 sqm, alongside external insulation, a new front canopy, and a widened vehicular entrance.

Extensionextensiondemolitioninsulation
Floor area
89 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Removal of existing single storey extension to the rear, removal of existing single storey garage and utility to side, provision of new extensions to rear and side of the existing house at ground and first floor level with a pitched roof to the side extension, and flat roofs to the rear extensions. The floor area of the house will be increased by 88.9sqm. A new zinc canopy to be provided over the front entrance, and existing vehicular entrance to be widened to 3.3 metres. All external walls to be provided with external insulation and render, with new windows and doors throughout, together with internal modifications, alterations to drainage, and ancillary works.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 February 2024.

Notified floor area: 108.9

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
56 Glenabbey Rd, Mount Merrion, DublinJan 2025€1,315,00070 m
23 Glenabbey Road, Mount Merrion, Co DublinNov 2025€1,410,00095 m
52 Cedarmount Road, Mount Merrion, Co DublinNov 2025€1,000,000105 m
49 Cedarmount Rd, Mount Merrion, BlackrockAug 2025€830,000115 m
35 Cedarmount Rd, Mount Merrion, BlackrockMar 2026€880,000154 m
21 Cedarmount Rd, Mount Merrion, DublinNov 2025€910,000156 m
66 South Ave, Mount Merrion, DublinFeb 2025€1,255,000163 m
64 South Ave, Mount Merrion, DublinMar 2026€1,390,000168 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 May 2023
  2. Decision due18 July 2023
  3. Decision issued13 July 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.