Planning Permission Ireland
GrantedExtensionDecided 7 March 2024

Riverwood, Cherrywood Road, Shankill, Dublin 18, D18R2V5

Demolition of two rear extensions to build two new extensions, a two-storey entrance/bedroom element, and a carport.

D23A/0583 · Dun Laoghaire Rathdown County Council · Lodged 13 February 2024

Reference
D23A/0583
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
13 February 2024

Summary

AI-generated

The project involves demolishing two single-storey rear extensions and constructing two smaller single-storey extensions, alongside an internal corridor. It also includes a new two-storey element for a new entrance and first-floor bedroom, roof adjustments, a new carport, an integrated shed, and widened entrance gates.

Extensionextensionrenovationdemolition
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The demolition of two existing single-storey extensions to the rear of the property
  • Construction of two smaller, single-storey extensions to the rear of the property
  • Construction of an internal single storey corridor to replace an existing outdoor courtyard
  • Construction of a new two storey element to facilitate a new entrance area and first floor bedroom
  • Remodelling of existing windows to various elevations
  • Construction of a new carport beside an existing garage
  • Construction of a new integrated shed structure as part of an extended existing roof
  • Adjustments to the existing roof profiles to the side and rear of the property
  • Adjustments to the width and height of an existing vehicular entrance to include new vehicular gates, a new pedestrian gate, new gate posts and higher walls to match the height of the existing boundary walls, together with all associated landscaping/site works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 15 April 2025.

Notified floor area: 374.5

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
The Coach House, Old Glebe, RathmichaelFeb 2026€875,000258 m
9 Glencarraig, Brides Glen Road, RathmichaelDec 2025€1,365,000322 m
Glen Burnie, Cherrywood Rd, Loughlinstown Dublin 18Jul 2025€783,000344 m
12 Tullyvale Cresent, Cherrywood, Dublin 18price excludes VATMar 2026€601,175377 m
9 Tullyvale Crescent, Cherrywood, Dublin 18price excludes VATApr 2026€726,872377 m
Apt 19 Garrison Mews, Cherrywood, Dublin 18May 2026€360,000377 m
17 Tullyvale Cresent, Cherrywood, Dublin 18price excludes VATFeb 2026€643,172377 m
9 Rathmichael Manor, Shankill, Dublin 18Oct 2025€600,000392 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 February 2024
  2. Decision due11 March 2024
  3. Decision issued7 March 2024

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.