Planning Permission Ireland
GrantedExtensionDecided 8 February 2024

2, Salzburg, Ardilea, Dublin 14, D14WR63

Demolition of the roof and partial demolition of a gable to build two-storey extensions, raise the ridge height, and add a dormer window.

D23A/0771 · Dun Laoghaire Rathdown County Council · Lodged 8 December 2023

Reference
D23A/0771
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
8 December 2023

Summary

AI-generated

This extensive renovation involves demolishing the existing roof and part of the south-facing first-floor gable. It proposes a new two-storey extension with a flat roof on the south side, a new two-storey gable extension on the north side, raising the ridge height for habitable attic space, and adding a north-facing dormer window.

Extensionextensionrenovationdormer

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Demolition of the existing roof structure
  • Partial demolition of the existing first floor gable to the south facing elevation, including demolition of the two existing chimneys
  • Proposed new two storey extension including new proposed new flat roof over demolished gable to the south facing elevation with proposed new chimney
  • Proposed new two storey gable roof extension to the north facing elevation, relocating of the main entrance
  • Proposed new roof structure including raising the ridge height to accomodate habitable rooms on first floor
  • Proposed dormer window to the north facing elevation including roof lights to north/south facing elevations
  • Proposed covered terrace area to south elevation
  • Proposed internal alterations & amendments to all elevations
  • Removal of one of two existing vehicle entrances, including all associated site works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 23 January 2025.

Notified floor area: 426.16

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
19 Ardilea Crescent, Heidelberg, ClonskeaghAug 2025€1,235,000128 m
45 Ardilea Crescent, Heidelberg, ArdileaDec 2025€691,000141 m
82 The Palms, Roebuck Rd, Dublin 14May 2025€845,000145 m
86 The Palms, Roebuck Rd, Clonskeagh Dublin 14Jul 2025€1,025,000173 m
23 Ardilea Crescent, Heidelberg, ClonskeaghAug 2025€1,500,008182 m
5 Sorbonne, Ardilea, Clonskeagh Dublin 14Jun 2025€1,119,000188 m
Apt 92 Ardilea Crescent, Heidelberg, ClonskeaghOct 2025€805,000191 m
Apt 98 Ardilea Crescent, Ardilea, ClonskeaghDec 2025€740,000191 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 December 2023
  2. Decision due9 February 2024
  3. Decision issued8 February 2024

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.