Planning Permission Ireland
GrantedAlterationsDecided 25 June 2024

95, George's Street Upper, Dun Laoghaire, Dublin, A96XY17

Partial demolition and construction of a four-storey mixed-use building behind a protected structure.

D24A/0003 · Dun Laoghaire Rathdown County Council · Lodged 31 May 2024

Reference
D24A/0003
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
31 May 2024

Summary

AI-generated

The proposal involves the partial demolition of a modern office extension behind a protected structure. It includes minor works to the protected building and the construction of a new four-storey mixed-use building with one commercial unit and five apartments.

Alterationsprotected structureapartmentsmixed usedemolition
Residential units
5
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(i) partial demolition of existing non original modern office extension to the rear of no. 95 george's street upper (a protected structure) and the corner of haigh terrace. (ii) minor works to the rear exterior wall of no. 95 georges street upper to provide for the reopening of 1 no. Window, creation of ope for 1 no. Door and provision of balcony to serve upper ground floor unit. (iii) construction of a 3 storey mixed use development with 4th storey stepped back to the rear of no. 95, comprising 1 no. Commercial unit (48sqm) and bicycle and bin storage (38sqm) at ground floor level and 5no. Residential units (2no. Studios, and 3 no. One-bedroom units) accross first, second and third floors. Each apartment will be provided with private amenity space in the form of a balcony/terrace space which include provision of trellis privacy screens. A total of 11 internal bicycle parking spaces are proposed to serve the development. (iv) all associated site and infrastructural works, including foul and surface water drainage, landscaping, plant areas, lighting, foul/surface drainage and signage necessary to facilitate the development.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 Century Court, Upper Georges St, Dun LaoghaireJan 2026€363,00062 m
31 Abbey Street, Cahir, TipperaryDec 2025€150,00063 m
5 Century Court, Upper Georges St, Dun LaoghaireFeb 2025€415,00075 m
Apartment 2, Brook House, Corrig AvenueFeb 2025€462,00092 m
5 Brook House, Corrig Avenue, Dun LaoghaireAug 2025€450,00092 m
3 Dungar Terrace, Dun Laoghaire, Co. DublinNov 2025€950,00097 m
Apt 24, Adelphi House, Upper Geogres StreetJan 2025€590,000130 m
3 Mariners Lane, Dun Laoghaire, DublinFeb 2025€865,000150 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 May 2024
  2. Decision due27 June 2024
  3. Decision issued25 June 2024
  4. Appeal submitted22 July 2024
  5. Appeal decided17 April 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.