Planning Permission Ireland
GrantedInfrastructureDecided 15 May 2024

Tesla Motors Ireland Limited, 92, Bracken Road, Sandyford Business Park, Dublin 18, D18CY92

Installation of four high-power Tesla electric vehicle charging bays and associated infrastructure.

D24A/0191 · Dun Laoghaire Rathdown County Council · Lodged 22 March 2024

Reference
D24A/0191
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
22 March 2024

Summary

AI-generated

The development at Sandyford Business Park consists of installing four electric vehicle charging bays with illuminated Tesla charging units and associated signage. It also includes a supercharger power cabinet, permeable paving, and relocated entrance signage.

Infrastructureev chargingteslainfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

High power electric vehicle charging points and associated infrastructure consisting of the following: i. Installation of 4 electric vehicle charging bays with 4 tesla illuminated charging units and associated signage. Ii. Installation of associated purposed tesla supercharger power cabinet equipment. Iii. Associated revisions to existing paved & landscaped areas including permeable paving asphalt installation in 4 proposed ev spaces. Iv. Existing tesla main id entrance signage and services column to be relocated. V. Erection of associated ev signage. Vi. All associated site development works including lighting, drainage infrastructure and line marking.

Land-use zoning

What this land is zoned for

Objective LIWWD
LIW To improve and provide for low density warehousing-light industrial warehousing uses.

National zoning type: Warehouse (excluding retail warehouse)

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 24 July 2023.

Notified floor area: 1,430

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
St Clares, Balally, SandyfordOct 2025€452,000220 m
Qapt 305 Beacon 1, Beacon South Quarter, Sandyford Dublin 18Apr 2025€421,000308 m
210 Beacon One Apartments, Beacon Court, SandyfordFeb 2025€207,000308 m
Apt 303, Beacon Court, Sandyford Dublin 18Dec 2025€395,000308 m
210 Beacon One Apartments, Beacon Court, SandyfordDec 2025€320,000308 m
Apt 508, 1 Beacon Court, SandyfordNov 2025€303,000308 m
2 Cube 2, Beacon South Quarter, SandyfordFeb 2025€405,000311 m
108 The Cubes 2, Beacon South Quarter, Sandyford Dublin 18Mar 2025€370,000311 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 March 2024
  2. Decision due16 May 2024
  3. Decision issued15 May 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.