Planning Permission Ireland
GrantedExtensionDecided 28 January 2026

14, Aubrey Grove, Shankill, Dublin 18, D18X956

Demolition of existing extensions and construction of new front and rear extensions with energy upgrades.

D25A/0923 · Dun Laoghaire Rathdown County Council · Lodged 1 December 2025

Reference
D25A/0923
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
1 December 2025

Summary

AI-generated

The project involves demolishing several existing ground-floor structures, including a porch, conservatory, and rear extension. It will be replaced with new front and rear extensions, a widened vehicular entrance, and an external insulation wrap.

Extensionextensionretrofitinsulation
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of the demolition of existing
  • Ground floor -front & side single-storey hipped roof over existing porch, playroom/office, toilet & utility room
  • Rear single storey flat roof & roof light over existing kitchen
  • Rear single storey conservatory structure
  • Rear / side concrete storage structure all to be removed construction of
  • New ground floor single storey front extension, incorporating new front door entrance with canopy structure over, new window into playroom/office extension
  • New flat roof over existing side playroom/office, toilet & utility room structure
  • New flat roof light into existing toilet
  • New single storey rear extension, comprising of new tv room with flat roof lights over. New minor internal alterations to ground floor level. Existing vehicular entrance to be altered, proposed new vehicular entrance to be made wider to take 2 no vehicles. Energy retrofit to existing & proposed dwelling, including external insulation wrap to external walls, replacement of windows, doors to existing two-storey semi-detached dwelling and associated site works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apple Tree House, 1a Aubrey Grove, ShankillFeb 2025€750,00088 m
44 Dorney Court, Shankill, Dublin 18Oct 2025€800,00097 m
3 Cluain Na Greine Court, Shankill, DublinNov 2025€546,000102 m
12 Aubrey Park, Shankill, Dublin 18Aug 2025€1,200,000103 m
134 Dorney Court, Shankill, DublinNov 2025€657,500127 m
103 Dorney Court, Shankill, DublinAug 2025€646,000147 m
Cedar House, Quinns Rd, ShankillApr 2026€830,000149 m
The Poplars, Quinns Rd, Shankill Dublin 18Dec 2025€2,500,000151 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 December 2025
  2. Decision due3 February 2026
  3. Decision issued28 January 2026

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.