Planning Permission Ireland
InvalidExtensionDecided 2 April 2026

Carraig Mews, Strand Road, Killiney, Dublin, A96DX21

Demolition of an external utility room and construction of a single-storey rear extension with a new roof terrace.

D26B/0184/WEB · Dun Laoghaire Rathdown County Council · Lodged 31 March 2026

Reference
D26B/0184/WEB
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
31 March 2026

Summary

AI-generated

The development involves the demolition of an external utility room, external stairs, and part of a lower ground floor bedroom. It includes the construction of a 40 square metre single-storey rear extension, internal reconfiguration, and a new landscaped roof terrace.

Extensiondemolitionextensionrenovation
Storey
1
Floor area
40 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: (a) demolition of an external utility room/ store, an existing external stair and associated balustrade/guarding, a two-part, split-level roof terrace and part of a lower ground floor en-suite bedroom. Total demolition area 17.6m2; (b) the construction of a single-storey rear extension with a total floor area of 40m2; (c) internal reconfiguration at lower ground floor level to accommodate an ensuite bedroom, home office, and utility room; (d) a new single-level, landscaped roof terrace; and (e) minor alterations to existing fenestration, new boundary treatments to roof terrace together with all associated site development works.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 Seafield Rd, Killiney, DublinDec 2025€1,260,000227 m
Eversley, Military Rd, KillineyJan 2026€1,900,000268 m
Abbeylands East, Military Rd, KillineyFeb 2025€2,750,000341 m
Lasserre, Military Rd, KillineyJul 2025€1,850,000342 m
104 Seafield Court, Seafield Rd, KillineyFeb 2025€705,000383 m
1 Killiney Court, Seafield Road, KillineyDec 2025€375,000439 m
87 Seafield Court, Killiney, DublinOct 2025€730,000467 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 March 2026
  2. Decision due25 May 2026
  3. Decision issued2 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.