Planning Permission Ireland
GrantedApartmentsDecided 24 June 2026

In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.

Construction of 188 residential units in Cherrywood.

DZ26A/0151/WEB · Dun Laoghaire Rathdown County Council · Lodged 12 January 2026

Reference
DZ26A/0151/WEB
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission (SDZ)
Received
12 January 2026

Summary

AI-generated

This application within the Cherrywood Strategic Development Zone proposes 188 residential units. The development comprises 80 apartments in two 5-storey blocks, 88 three-storey duplex units, and 20 houses.

Apartmentssdzapartmentsduplexhousing estate
Residential units
188
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Lsref v eden tc6 limited intend to apply for permission on a site in the townlands of laughanstown and cherrywood, in cherrywood, dublin
  • This application relates to development within the cherrywood strategic development zone (sdz) and is subject to the cherrywood planning scheme 2014, as amended. The site of the residential development is in an area known as tc6 and is located in cherrywood planning scheme area and forms part of development area 2 – cherrywood. The site of the residential development is generally bounded by bishop street to the south, tully park to the north and east and a post-primary school site (permitted under reg. Ref. Dz21a/1038) to the west. The development proposed consists of 188no. Residential units in a mixture of houses, duplexes and apartments. The overall development proposed comprises the following: 80no. Apartments accommodated in 2no. Blocks up to 5 storeys in height. Block a includes 40no. Units (28no. 1-bedroom and 12no. 2-bedroom) with balconies/terraces and block b accommodates 40no. Units (29no. 1-bedroom and 11no. 2-bedroom) with balconies/terraces. 88no. 3 storey duplex units (25no. 1-bedroom, 29no. 2-bedroom and 34no. 3-bedroom). 20no. 3 storey 4-bedroom houses. All associated and ancillary site development and infrastructural works, car and cycle parking, drainage, hard and soft landscaping, communal and private open space, bin stores, esb substations, bike stores and mobility hubs. Vehicular access is provided from a single existing access point from bishop street. The proposed development consists of revisions/modifications to approximately 0.75ha of the works permitted at the tully park development (permitted pursuant to reg ref dz15a/0813, as extended by dz15a/0813/e and amended by reg ref dz17a/0714, reg ref dz17a/0862, reg ref dz18a/0458 and reg. Ref. Dz20a/0946) comprising the: modification and relocation of the level 5 local neighbourhood road along boundary with tully park immediately adjoining the development; the inclusion of a part m compliant footpath in the greenway located alongside the permitted cherrywood square / tully park link access route linking bishop street with tully park; amendment to entrance details at tully park entrances. Tully park itself is not affected by the development being proposed. No works are proposed to or in the vicinity of tully church graveyard or within its grounds (ref: du026023001-2; national monument no. 225) or to the national monument including the high crosses (ref: du026023003, 4
  • National monument no. 216). The planning application may be inspected or purchased for a fee not exceeding a reasonable cost of making a copy, at the offices of the planning authority, marine road, dún laoghaire, co. Dublin, during its public opening hours of monday to friday from 10:00am to 4:00pm. A submission or observation in relation to the application may be made in writing to the planning authority, on payment of a fee of €20 within 5 weeks of receipt of the application by the planning authority and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
715 Block F, Domville Crescent, Domvilleprice excludes VATFeb 2026€422,907172 m
605 Domville Crescent, Cherrywood, Dublin 18price excludes VATMay 2025€352,442180 m
704 Block F, Domville Crescent, Domvilleprice excludes VATMar 2026€431,718182 m
704 Domville Crescent, Domvilleprice excludes VATMar 2026€431,718182 m
Apartment 701, Domville Crescent, Domvilleprice excludes VATApr 2026€361,233182 m
710 Block F, Domville Crescent, Domvilleprice excludes VATMar 2026€440,528182 m
12 Domville Court, Domville, Cherrywoodprice excludes VATApr 2025€732,467196 m
629 Block H, Domville Crescent, Cherrywoodprice excludes VATMay 2025€559,471213 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 January 2026
  2. Decision due24 June 2026
  3. Decision issued24 June 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.