Planning Permission Ireland
GrantedApartmentsDecided 22 July 2024

Lands located at the junction of Northwood Avenue and Northwood Crescent/Northwood Park, Northwood, Santry, Dublin 9.

Extension of duration for Phase 2 of a Santry development comprising 99 apartments and office space.

F18A/0438/E1 · Fingal County Council · Lodged 29 May 2024

Reference
F18A/0438/E1
Authority
Fingal County Council
Register status
Decided
Type
Extension Of Duration Of Permission
Received
29 May 2024

Summary

AI-generated

This application seeks an extension of duration for Phase 2 of a masterplan in Santry. The development includes a 2-6 storey residential block over a ground floor podium containing 99 apartments, a retail/café unit, and office space.

Apartmentsapartmentsofficeextension of duration
Residential units
99
Storeys
7
Floor area
8,611 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The proposed development on this site of c. 0.83 hectares is phase 2 of a 2-phase masterplan for a mixed residential and commercial development on an overall site of c. 1.47 hectares, including adjoining lands to the west bound by northwood avenue and domville wood (the old ballymun road). The proposed phase 2 development will comprise the construction of 2 no. Blocks comprising offices and residential development respectively and shares the central access and circulation space with phase 1 (reg. Ref. F18a/0421). The residential development will comprise a 2-6 storey block (c. 8,611 sq. M gross floor area) over ground floor podium (up to 7 storeys in total) to include: 99 no. Apartments consisting of 12 no. Studio units, 38 no. 1 bed units, 41 no. 2 bed units and 8 no. 3 bed units with balconies/terraces on all elevations; 2 no. Communal roof gardens at fifth floor level and a central communal open space at podium level (c. 811 sq. M); a retail/café unit of 98 sq. M at ground floor level; 100 no. Car parking spaces to include 88 no. Car parking spaces under podium and 12 no. On-street residential car parking spaces; 8 no. Motorbike parking spaces under podium; 142 no. Cycle spaces; 3 no. Car sharing parking spaces (common to phase 1 and phase
  • And all other ancillary spaces including circulation areas, meeting rooms and lounges, waste management rooms, switchroom and plant rooms with provision for either centralised or modular heating systems. The office development will comprise the construction of a 4 storey commercial office building (c. 2,638 sq. M. Gross floor area); 36 no. Cycle spaces; and 27 no. On-street office car parking spaces and all other ancillary spaces including reception area, changing and shower facilities, circulation areas, esb substation, waste management room, switchroom and plant rooms. The development will also consist of the provision of public open spaces with children's play area; external circulation areas; all hard and soft landscaping, including boundary treatments and removal of existing trees and their replacement with semi-mature trees; public art, green roofs; changes in level; and all other associated site excavation works, site development works and site services above and below ground. Add info received 11th december 2018. Add info deemed significant 12th december 2018. Revised public notices received 18th december 2018. Clarification of add info received 12th february 2019

Key dates

Timeline

  1. Application received29 May 2024
  2. Decision due23 July 2024
  3. Decision issued22 July 2024
  4. Permission expiry29 May 2027

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.