4 The Mews, Robswall, Malahide, Co. Dublin.
Installation of ten solar panels on the south-facing roof.
F19A/0305 · Fingal County Council · Lodged 12 July 2019
- Reference
- F19A/0305
- Authority
- Fingal County Council
- Register status
- Decided
- Type
- Permission
- Received
- 12 July 2019
Summary
AI-generatedThe development consists of the installation of 10 photovoltaic solar panels. These will be fitted to the south-facing rear roof of the existing mews property.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Installation of 10 x solar panels (photovoltaic) to the south facing r
Land-use zoning
What this land is zoned for
“Provide for residential development and protect and improve residential amenity”
National zoning type: Existing residential
Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 14 July 2014.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 8 The Court, Robswalls, Malahide | Sept 2025 | €450,000 | 18 m |
| 1 The Mews, Robswall, Malahide | May 2025 | €625,000 | 31 m |
| 10 The Mews, Carberry Meadows, Balmostonprice excludes VAT | Jun 2025 | €497,797 | 36 m |
| 1 The Court, Robswall, Malahide | Dec 2025 | €323,952 | 41 m |
| 64 The Crescent, Robswall, Malahide | Jul 2025 | €460,000 | 51 m |
| 67 The Crescent, Robswall, Malahide | Aug 2025 | €321,000 | 52 m |
| 15 Parkview, Robswall, Malahide | May 2026 | €454,000 | 78 m |
| 5 The Crescent, Robswall, Malahide | Feb 2026 | €505,000 | 82 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received12 July 2019
- Further information requested17 July 2019
- Decision due5 September 2019
- Decision issued3 September 2019
- Grant issued9 October 2019
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Construction of a single storey extension to the side of the existing
4 The Mews, Robswall, Malahide, Co. Dublin.
F13B/0107FingalLodged 16 Jul 2013Extension
- Refused30 m away
Convert the existing garage to a kitchen and to add a single-storey ex
3 The Mews, Robswall, Malahide, Co. Dublin
F21B/0275FingalLodged 20 Jul 2021Extension
- Refused30 m away
The development consists of the construction of a new pitched roof extension at first floor level to the rear…
57 The Crescent, Robswalls, Malahide, Co. Dublin, K36 N226
F25A/1045EFingalLodged 11 Nov 2025Extension
- Refused30 m away
The development consists of the construction of a new 10sqm first floor extension with flat roof to the rear…
57 The Crescent, Robswalls, Malahide, Co. Dublin, K36 N22
F24A/0550FingalLodged 20 Jun 2024Extension
- Granted40 m away
Permission for a single storey extension to the rear of existing dwell
11 The Mews, Robswall, Malahide, Co Dublin
F22B/0101FingalLodged 14 Apr 2022Extension
- Granted40 m away
A two storey extension to the side of the existing dwelling, a single
13 The Mews, Robswall, Malahide, Co.Dublin
F13B/0153FingalLodged 26 Sept 2013Extension
- Granted50 m away
Conversion of existing garage into a home office to include changes to
15 The Mews, Robswall, Malahide, Co Dublin, K36 XY33
F21B/0138FingalLodged 20 Apr 2021Extension
- Granted60 m away
The removal of existing first floor balcony door and railings to front and the replacement with zinc clad…
53, Biscayne, Malahide, Co. Dublin, K36KC61
F24A/0095EFingalLodged 12 Feb 2024Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Installation of 14 solar panels (photovoltaic), South and West facing
12 Glen Ellan Avenue, Swords, Co. Dublin, K67 H5C8
F20A/0215FingalLodged 14 May 2020
- GrantedAlterations
Installation of 10 solar panels to the front roof of the existing dwelling
57 Sli an Aifrinn , Athlone
197227WestmeathLodged 30 Oct 2019
- GrantedAlterations
The works comprise installation of 10 PV solar panels on the rear south roof of the dwelling house
2 York Terrace, Dun Laoghaire, Co Dublin (A Protected Structure)
D22A/0702Dún Laoghaire–RathdownLodged 19 Sept 2022
- Exempt — no permission neededEnergy
Installation of 10 No Solar Panels on south facing. Side of roof of subject building
7 Clifton Terrace, Monkstown, Blackrock, Dublin, A94 H0C0 (A Protected Structure)
REF2925Dún Laoghaire–RathdownLodged 3 Mar 2025
- GrantedEnergy
The installation and erection of a 11.4kw PV solar panel system and associated site works to the rear south…
Main Street , Templemore , Co Tipperary
22585TipperaryLodged 30 Sept 2022
- GrantedAlterations
Erection of 11 no. PV modules, including all electrical and mounting equipment, on south facing slope of…
Beaumont , Roaring Springs Road , Clonmel
20169TipperaryLodged 25 Feb 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.