Planning Permission Ireland
GrantedApartmentsDecided 22 March 2023

60 Main Street, Howth, Co. Dublin, D13 N8K3.

Demolition of a function room to build 32 apartments, and conversion of an office building into 4 apartments.

F22A/0477 · Fingal County Council · Lodged 24 February 2023

Reference
F22A/0477
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
24 February 2023

Summary

AI-generated

The development involves the demolition of an existing single-storey function room to build a 3 to 4-storey over-basement apartment building containing 32 units. It also includes the change of use of an existing two-storey office building on Main Street into 4 apartments. The scheme will provide 37 car parking spaces and 68 bicycle spaces.

Apartmentsapartmentsdemolitionchange of use
Residential units
36
Storeys
4
Floor area
376 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: (i) demolition of the existing single-storey function room currently in office use (376sq. M) to the rear of the site; (ii) development of a residential scheme, totalling 36 no. Residential units (comprising 14 no. 1 bed units and 22 no. 2 bed units). The scheme will consist of: (a) the construction of a 3 to 4 storeys (over-basement) building, consisting of 32 no. Residential apartments, comprising 12 no. 1 bed unlts and 20 no. 2-bed units. Each unit will be provided with private open space in the form of a balcony or terrace. The structure will be provided with solar panels at rooftop level. {b) the change of use of the existing 2-storey office building fronting onto main street to residential use consisting of 2 no. 1-bed apartments and 2 no. 2 bed apartments. (c) the development will be served by a total of 68 no. Bicycle parking spaces, consisting of 56 no. Internal bicycle parking spaces to be provided at basement level and 12 no. Bicycle parklng spaces to be provided at surface level. The development will provide for a total of 37 no. Car parking spaces (including 2 no. Mobllity impaired user parking spaces). (d) a communal landscaped area for all apartments at ground floor level. (iii) associated site and infrastructural works are also proposed, which include: foul and surface water drainage, landscaping, boundary treatments, and all associated site development works necessary to facilitate the development. Ai received 24/02/2023

Land-use zoning

What this land is zoned for

TC - Town and District CentreUC
Protect and enhance the special physical and social character of town and district centres and provide and/ or improve urban facilities

National zoning type: City/Town/village Centre, central area

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 4, Emo House, 69 Main St Dublin 13Feb 2025€405,00094 m
3 Asgard Park, Howth, Dublin 13Mar 2026€1,100,000123 m
5 St Marys Place, Howth, DublinMay 2025€667,000160 m
21 Church Street, Howth, Co DublinAug 2025€650,000172 m
4 Garland Court, Abbey Street, HowthJan 2026€500,000175 m
28 Abbey Street, Dublin 1, 109 Marlborough StreetJul 2025€440,000186 m
St Anthony, Nashville Rd, HowthFeb 2026€1,850,000186 m
18 St Laurences Terrace, Howth, Dublin 13Oct 2025€610,000204 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 February 2023
  2. Decision due23 March 2023
  3. Decision issued22 March 2023
  4. Appeal submitted18 April 2023
  5. Appeal decided9 August 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.