GrantedApartmentsDecided 22 August 2023

Hollytree House, Nevinstown, Swords, Dublin, K67D1R8

Demolition of a house in Swords to build 85 apartments in a building up to eight storeys tall.

F22A/0687 · Fingal County Council · Lodged 26 July 2023

Reference
F22A/0687
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
26 July 2023

Summary

AI-generated

The development involves the demolition of Hollytree House (449.2 sqm) and the construction of 85 apartments (35 one-bed, 37 two-bed, and 13 three-bed units) within a 5 to 8 storey building over an undercroft. The project will also provide 50 car parking spaces, 293 bicycle spaces, and landscaped public and communal open spaces.

Apartmentsdemolitionapartmentsresidential
Residential units
85
Storeys
8
Floor area
449 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development at this (c. 0.54 ha). The subject site overlaps and will supersede part of planning permission reg. Ref. : f18a/0306 adjoining to the west resulting in the omission of 8 no. Apartments as permitted. The development will consist of
  • Demolition of existing residential dwelling hollytree house (c. 449.2 sqm)
  • Construction of 85 no. Residential apartments (35 no. 1-bed, 37 no. 2-bed units and 13 no. 3 bed units) within a 5
  • 8 no. Storey (over undercroft) building, with all apartments served by private terrace or balcony
  • Access shall be via internal road branching south from boroimhe link road l2300 serving permitted development reg. Ref. : f18a/0306 adjoining to the west
  • Landscaped public open space in the northern part of the site fronting the boroimhe link road l2300 (on lands zoned open space) and additional public open space across the site and communal open space including children's play area
  • Provision of 50 no. Car parking spaces. 49 no at basement level (including 2 no. Disabled access spaces) - all accessed via vehicular ramp and 1 no disabled access space at ground level
  • Provision of 293 no. Bicycle parking spaces: 218 no. At basement level accessed via cycle ramp and 75 no. Bicycle parking spaces at ground level
  • Esb substation, switch room, bin storage and bicycle storage at ground level at the southern perimeter, with green roof and pv panels at roof level, as well as plant at basement level and all associated works and infrastructure to facilitate the development. Ai received 12/05/23 sai received 19/05/23 cai received 26/7/2023

Land-use zoning

What this land is zoned for

RS - ResidentialRS
Provide for residential development and protect and improve residential amenity

National zoning type: Existing residential

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 1 March 2024.

Notified floor area: 10,661

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
21 Boroimhe Elms, Boroimhe, SwordsMar 2025€285,00061 m
8 Boroimhe Elms, Boroimhe, SwordsMar 2026€315,000103 m
13 Boroimhe Elms, Swords, DublinJun 2026€445,000105 m
9 Boroimhe Maples, Swords, DublinOct 2025€505,000118 m
107 Boroimhe Hazel, Swordsprice excludes VATApr 2026€502,203120 m
6 Boroimhe Maples, Swords, DublinFeb 2026€440,000128 m
21 Boroimhe Maples, Swords, DublinMar 2026€320,000145 m
101 Boroimhe Hazel, Swordsprice excludes VATApr 2026€506,600155 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 July 2023
  2. Decision due22 August 2023
  3. Decision issued22 August 2023
  4. Appeal submitted18 September 2023
  5. Appeal decided24 July 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.