ESB Telecoms Telecommunications Compounds, ESB's Glasmore 110kV Electricity Substation, Rathbeale Road, Swords, Co. Dublin

Erection of a 20-metre telecommunications monopole at an electricity substation in Swords.

F24A/0227 · Fingal County Council · Lodged 14 March 2024

Reference
F24A/0227
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
14 March 2024

Summary

AI-generated

ESB Telecoms Ltd is seeking permission to erect a 20-metre high telecommunications monopole structure with antennae dishes and ground equipment. The project will also involve removing two existing pylon structures and a cabin to consolidate facilities.

Infrastructuretelecomsinfrastructuremonopole

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought by esb telecoms ltd for the erection of a 20 metre high telecommunications monopole structure with antennae dishes and associated equipment (including lighting finial), ground equipment and all associated ground works to enable consolidation of existing telecommunications facilities in the vicinity on a single dedicated structure and site. Works to include the removal of two existing pylon type structures along the northeastern boundary of the electricity substation with laurelton , and removal of a cabin along the boundary of glen ellan road at esb telecoms ltd telecommunications compounds at esb's glasmore 110 kv electricity substation, rathbeale road swords, dublin.

Land-use zoning

What this land is zoned for

RS - ResidentialRS
Provide for residential development and protect and improve residential amenity

National zoning type: Existing residential

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
13 Laurelton, Swords, DublinMar 2025€440,00071 m
25 Glen Ellen Walk, Swords, DublinJun 2026€519,00084 m
53 Brides Glen Park, Swords, DublinMar 2025€560,00092 m
19a Glen Ellan Walk, Swords, Co. DublinMay 2025€530,000133 m
2 Cianlea, Rathbeale Rd, SwordsJun 2025€500,000133 m
36 Brides Glen Park, Swords, DublinJun 2025€530,000134 m
54., Brides Glen Avenue, SwordsJan 2010€337,500159 m
52 Bridesglen Ave, Swords, DublinJul 2025€500,000161 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 March 2024
  2. Decision due8 May 2024
  3. Decision issued7 May 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.