Corballis, Donabate, County Dublin, K36 FY70
Construction of a new four-bedroom dormer dwelling following the demolition of outbuildings.
F24A/0352 · Fingal County Council · Lodged 18 April 2024
- Reference
- F24A/0352
- Authority
- Fingal County Council
- Register status
- Decided
- Type
- Permission
- Received
- 18 April 2024
Summary
AI-generatedThe project involves the subdivision of an existing family home site to construct a new four-bedroom dormer dwelling of approximately 195 square meters. Works include the demolition of a greenhouse, polytunnel, and shed, alongside the installation of new bio-cycle systems.
- Residential unit
- 1
- Floor area
- 195 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The construction of a 4 bedroom dormer dwelling (c. 195m2 gfs) with vehicular access lane serving existing family home and subdivision of the existing family home site. Works to include demolition of a greenhouse, polytunnel and a shed, the replacement of an existing septic tank with a new bio-cycle and the additional of a new bio-cycle, on-site surface water disposal system and all other associated site works located adjacent to the existing family home. A natura impact statement will be submitted to the planning authority with the application. Ai received 22/07/24
Land-use zoning
What this land is zoned for
“Provide for small scale infill development serving local needs while maintaining the rural nature of the cluster”
National zoning type: Residential, mixed residential and other uses
Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 28 November 2024.
Notified floor area: 195 m²
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received18 April 2024
- Decision due13 September 2024
- Decision issued3 September 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- InvalidAt this site
NIS Planning permission for the construction of a 4 bedroom dormer dwelling (c. 195m2 GFS) with vehicular…
Corballis, Donabate, County Dublin, K36 FY70
F24A/0327FingalLodged 11 Apr 2024New dwelling
- Withdrawn40 m away
1/ Change of use of existing two storey office to domestic dwelling ho
Homefarm, Corballis, Donabate, Co Dublin
F19A/0433FingalLodged 16 Sept 2019Change of use
- Withdrawn40 m away
Permission for — change of use of existing two storey office to domes
Homefarm, Corballis, Donabate, Co Dublin
F18A/0091FingalLodged 27 Feb 2018Change of use
- Granted80 m away
NIS The proposed development will consist of : Demolition of existing garage to the East of existing…
Anchor Lodge, Corballis, Donabate, Co. Dublin, K36N187
F24A/0726FingalLodged 9 Aug 2024Extension
- Granted90 m away
2 storey extension to both front and rear of existing house, relocatio
Corballis, Donabate, Co. Dublin.
F15A/0177FingalLodged 22 Apr 2015Extension
- Refused130 m away
The demolition of existing 2-storey return to rear and the constructio
'Liseux', Corballis, Donabate, Co. Dublin
F11B/0034FingalLodged 22 Dec 2011Demolition
- Granted170 m away
Permission for modifications to previously approved development Reg. R
Balcarrick, Donabate, Co. Dublin
F12A/0328FingalLodged 22 Oct 2012Alterations
- Granted170 m away
To retain re-designed porch to the front of house previously granted u
Balcarrick, Donabate, Co Dublin
F13B/0163FingalLodged 8 Oct 2013Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- InvalidNew dwelling
NIS Planning permission for the construction of a 4 bedroom dormer dwelling (c. 195m2 GFS) with vehicular…
Corballis, Donabate, County Dublin, K36 FY70
F24A/0327FingalLodged 11 Apr 2024
- GrantedNew dwelling
To construct a dwelling house consisting of a dormer to the principal elevation with a flat roof interlink…
Ardcotten Collooney Co.Sligo F91YY20 ,
2460168SligoLodged 14 May 2024
- GrantedNew dwelling
(a) Construction of a new 4 bedroom dormer style dwelling and single storey domestic garage; (b) New…
Tipper East , Naas , Co. Kildare.
22888KildareLodged 21 Jul 2022
- GrantedExtension
Demolition of single storey rear extension, refurbishment of existing dwelling with new dormer window to the…
Ardgoom Inward, Beara, Co. Cork, P75F342
2377corkLodged 20 Feb 2023
- Awaiting decisionNew dwelling
A) Construction of a new 4 bedroom dormer style dwelling and single storey domestic garage, B) New wastewater…
Tipper East , Naas , Co. Kildare.
22853KildareLodged 12 Jul 2022
- GrantedNew dwelling
The Construction of a Proposed 4 Bedroom Single Storey Dwelling, Wastewater Treatment System with Raised…
Castlequarter Coosan , Athlone , Co. Westmeath
2460127WestmeathLodged 19 Apr 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.