Planning Permission Ireland
GrantedNew dwellingDecided 3 September 2024

Corballis, Donabate, County Dublin, K36 FY70

Construction of a new four-bedroom dormer dwelling following the demolition of outbuildings.

F24A/0352 · Fingal County Council · Lodged 18 April 2024

Reference
F24A/0352
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
18 April 2024

Summary

AI-generated

The project involves the subdivision of an existing family home site to construct a new four-bedroom dormer dwelling of approximately 195 square meters. Works include the demolition of a greenhouse, polytunnel, and shed, alongside the installation of new bio-cycle systems.

New dwellingnew dwellingdormerdemolition
Residential unit
1
Floor area
195 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of a 4 bedroom dormer dwelling (c. 195m2 gfs) with vehicular access lane serving existing family home and subdivision of the existing family home site. Works to include demolition of a greenhouse, polytunnel and a shed, the replacement of an existing septic tank with a new bio-cycle and the additional of a new bio-cycle, on-site surface water disposal system and all other associated site works located adjacent to the existing family home. A natura impact statement will be submitted to the planning authority with the application. Ai received 22/07/24

Land-use zoning

What this land is zoned for

RC - Rural ClusterRS
Provide for small scale infill development serving local needs while maintaining the rural nature of the cluster

National zoning type: Residential, mixed residential and other uses

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 28 November 2024.

Notified floor area: 195

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 April 2024
  2. Decision due13 September 2024
  3. Decision issued3 September 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.