Planning Permission Ireland
GrantedIndustrialDecided 9 May 2024

Millennium Business Park, Cappagh Road, Ballycoolin, Dublin 11.

Extension of duration for concrete batching plant expansion and a new two-storey office building in Ballycoolin.

FW18A/0087/E1 · Fingal County Council · Lodged 25 March 2024

Reference
FW18A/0087/E1
Authority
Fingal County Council
Register status
In progress
Type
Extension Of Duration Of Permission
Received
25 March 2024

Summary

AI-generated

An extension of duration is sought for the expansion of an existing concrete batching plant and the construction of a two-storey office, logistics, and training building. The works also involve the demolition of a derelict dwelling and agricultural barns, and the addition of seven silos.

Industrialconcrete plantdemolitionextension of duration
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the expansion of the existing concrete batching plant facility within the northern portion of the site and construction of a 2 storey building for office / logistics / training / staff welfare uses and associated facilities within the south-western portion of the site. The development will consist of: the demolition of 1 no. Single storey derelict dwelling and existing agricultural barns / outbuildings; the refurbishment of the existing batching plant structure (c. 23.03 metres in height) with the addition of 7 no. Silos; aggregate bins (c. 19.08 metres in height), drive-over / tip-in hopper, 1 no. Concrete reclaimer, 1 no. Wash-out area / tank, 2 no. Double and 1 no. Single covered aggregate storage bays; 1 no. Wheel-wash facility, 2 no. Weighbridges (1 no. With single storey portacabin, c. 13.3 sqm gfa), 1 no. Single storey workshop building (c. 234 sqm gfa); 1 no. Esb supply and switchroom; refurbishment of existing esb sub-station as a storage unit; 1 no. Bunded covered fuel tank; 1 no. Waste recycling storage facility; the construction of 1 no. Vehicular access from cappagh road to serve the plant facility (replacing 2 no. Existing accesses: 1 no. Access to former agricultural sheds / use on site; and 1 no. Access to derelict dwelling); delineation of 32 no. Truck parking bays. Permission is also sought for the construction of 1 no. 2 storey building comprising office / logistics / training / staff welfare uses (c. 591 sqm gfa) fronting to cappagh road (with signage on all elevations), 1 no. Ancillary surface car park comprising c. 62 no. Spaces and 1 no. Bicycle parking shelter. The building and car park will be served by a proposed vehicular/ pedestrian access on the western side of site, accessed through millennium business park. Permission is sought for all associated landscape and boundary treatment works including revised boundary wall on western side of site; associated site lighting; provision of signage at both proposed vehicular entrance points; all site services (foul and surface water drainage and water supply) including 1 no. Overground water tank and 1 no. Underground water reservoir tank; and all other associated site excavation, infrastructural and site development works above and below ground.

Key dates

Timeline

  1. Application received25 March 2024
  2. Decision due17 May 2024
  3. Decision issued9 May 2024
  4. Permission expiry28 March 2029

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.