8 Warrenstown Green, Mulhuddart, Dublin 15, D15 T3H4
Permission and retention application for works replacing a first-floor element in Mulhuddart.
FW22A/0202 · Fingal County Council · Lodged 12 September 2022
- Reference
- FW22A/0202
- Authority
- Fingal County Council
- Register status
- Decided
- Type
- Permission and Retention
- Received
- 12 September 2022
Summary
AI-generatedThis application seeks permission and retention permission for development works consisting of replacing an existing first-floor element at 8 Warrenstown Green.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The development will consist /consists of replacing exisiting first fl
Land-use zoning
What this land is zoned for
“Provide for residential development and protect and improve residential amenity”
National zoning type: Existing residential
Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 10 April 2025.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 20 Warrenstown Grove, Blanchardstown, Dublin 15 | Jun 2025 | €418,000 | 68 m |
| 27 Warrenstown Lawn, Blanchardstown, Dublin 15 | Dec 2025 | €260,000 | 91 m |
| 11 Warrenstown Grove, Blanchardstown, Dublin | May 2025 | €378,000 | 120 m |
| 2 Warrenstown Way Blanchardstown, Blanchardstown Dublin 15, Dublinnot full market price | Nov 2025 | €80,000 | 141 m |
| 12 Warrenstown Walk, Blanchardstown, Dublin 15not full market price | Oct 2025 | €319,000 | 146 m |
| 8 Warrenstown Way, Blanchardstown, Dublin 15 | May 2025 | €345,000 | 154 m |
| 19 Warrenstown Walk, Blanchardstown Meath, Blanchardstown | May 2026 | €381,000 | 160 m |
| 28 Warrenstown Green, Blanchardstown, Dublin 15 | May 2026 | €436,000 | 161 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received12 September 2022
- Decision due4 November 2022
- Decision issued3 November 2022
- Grant issued14 November 2023
- Appeal submitted16 November 2022
- Appeal decided14 November 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- RefusedAt this site
Planning permission for replacing existing first floor level side bedr
8 Warrenstown Green, Mulhuddart, Dublin 15, D15 T3H4
FW22A/0065FingalLodged 7 Apr 2022Alterations
- RefusedAt this site
The retention of a single storey ground floor porch extension to the f
8 Warrenstown Green, Mulhuddart, Dublin 15, D15 T3H4
FW21B/0170FingalLodged 17 Nov 2021Retention
- Granted60 m away
Removal of single storey bay window to side and relocation of main hal
23 Warrenstown Grove, Blanchardstown Heath, Dublin 15
FW12A/0023FingalLodged 12 Mar 2012Alterations
- Granted100 m away
Permission sought for single storey granny flat and kitchen extension
15, Warrenstown Grove, Blanchardstown, Dublin 15
FW19A/0016FingalLodged 27 May 2019Extension
- Granted120 m away
Permission for , A. Attic conversion incorporating dormer extension
24 Warrenstown Green, Blanchardstown, Dublin 15
FW14B/0075FingalLodged 1 Apr 2015Extension
- Granted130 m away
Development will consist of a new ground floor only detached building in the rear of the existing site to be…
20 Warrenstown Close, Dublin 15, D15 F8F1
FW24A/0376FingalLodged 19 Sept 2024Extension
- Invalid130 m away
Development will consist of a new ground floor only detached building in the rear of the existing site to be…
20 Warrenstown Close, Dublin 15, D15 F8F1
FW24A/0363FingalLodged 6 Sept 2024Extension
- Granted130 m away
Revisions to permitted application ( FW15B/0081), to include new first
23 Warrenstown Close, Blanchardstown, Dublin 15
FW16B/0120FingalLodged 18 Nov 2016Alterations
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedExtension
The proposed development will consist of the construction of a first f
144 Carlton Court, Swords, Co .Dublin
F22B/0173FingalLodged 11 Aug 2022
- GrantedExtension
The development will consist of; the construction of a new first floor
133 Georgian Village, Castleknock, Dublin 15
FW18B/0069FingalLodged 18 Jun 2018
- GrantedInfrastructure
The development will consist/consists of: Construction of a new single
Fuel Farm Facility, Corballis Park, Dublin Airport, Co. Dublin.
F17A/0006FingalLodged 9 Jan 2017
- GrantedExtension
The development will consist of a new first floor level over the exist
27 Warren Green, Baldoyle, Dublin 13.
F22B/0019FingalLodged 20 Jan 2022
- GrantedAlterations
The development will consist / consists of
131 Littlepace Walk, Clonee, Dublin 15
FW18B/0021FingalLodged 9 Mar 2018
- Awaiting decisionAlterations
The development will consist of: (i) The replacement of the existing d
White Horses, Strand Road, Sutton, D13 AK09
F25A/0397EFingalLodged 7 May 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.