InvalidEnergyDecided 14 March 2023

Damastown Road, Damastown Industrial Park, Dublin 15, D15 K851

Installation of a 2.4 MW ground-mounted solar PV farm at Damastown Industrial Park.

FW23A/0054 · Fingal County Council · Lodged 13 March 2023

Reference
FW23A/0054
Authority
Fingal County Council
Register status
Invalid or incomplete
Type
Permission
Received
13 March 2023

Summary

AI-generated

The development consists of erecting 12,082 square meters of ground-mounted photovoltaic panels to form a 2.4 MW solar PV farm. The generated electricity will be used by the adjacent Guerbet Pharmaceutical plant.

Energysolarindustrialrenewable energy
Floor area
12,082 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission to erect 12,082 m2 of photovoltaic panels, ground mounted system. The development will comprise of a 2.4 mw solar pv farm on a site at damastown road, damastown industrial park, dublin 15, d15 ye36, immediately to the northwest of the existing guerbet pharmaceutical plant, this land allocated at the northwest of guerbet pharmaceutical plant has 4.81 acres. The electricity generated will be used the electricity generated will be used by the guerbert pharmaceutical site that currently operates under an industrial emissions (ie) license (p0050-02) and greenhouse gas permit (ghg permit) no. Ie-ghg019-10349-02, under part iv of the environmental protection agency act 1992 (as amended for the protection of the environment act, 2003). The development will comprise of photovoltaic panels with ballasted frames together with all ancillary cabling and electrical infrastructure; 1 no. Transformer cabin; 1 no. Spare parts cabin; using all temporary ways, temporary construction compound / set-down area; boundary security fencing included on the application, granted under planning permission reference no. Fw21a/0185 and underground medium voltage electrical connection from transformer building, also under application fw21a/0185, into the immediately adjoining industrial site; and all associated site development works, all on a site of 12.22 acres.

Key dates

Timeline

  1. Application received13 March 2023
  2. Decision due5 May 2023
  3. Decision issued14 March 2023

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.