Planning Permission Ireland
InvalidCommercialDecided 27 March 2023

Blanchardstown Industrial Park, Snugborough Road, Dublin 15

Five-year extension of permission for temporary two-storey modular office buildings.

FW23A/0066 · Fingal County Council · Lodged 16 March 2023

Reference
FW23A/0066
Authority
Fingal County Council
Register status
Invalid or incomplete
Type
Permission
Received
16 March 2023

Summary

AI-generated

The application seeks a five-year extension of time for temporary two-storey modular office buildings and an external access stairway. The total gross floor area of the temporary site accommodation is 329.7 square metres.

Commercialofficetemporaryextension of time
Storeys
2
Floor area
330 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for a 5 year extension of time for a previously granted planning permission, ref fw18a/0170: for permission, retention and extension of use for temporary two storey modular office buildings (site accommodation) and external access stairway. Total gross floor area 329.7sqm (gross ground floor 163.7 sqm, gross first floor area 166sqm). The application consists of three parts as follows
  • Extension of permission, for an additional five years (nov 23 to nov
  • For the existing temporary modular office accommodation at first floor level, gross floor area 166 sqm
  • Extension of the retention permission, for an additional five years (nov 23 to nov
  • For an existing temporary modular office accommodation at part ground floor level (gross floor area 78.5 sqm)
  • Extension of continuation of use permission, for a previously granted retention permission (reg. Ref. Fw15a0115), for an additional five years (nov 23 to nov 28), for an existing temporary modular office accommodation at part ground floor level (gross floor area 85.2 sqm). The application is to include all necessary site works all as located to the south of building b3. This additional permission, extension of time, retention, continuation of use permission is required to facilitate ongoing site development works. This planning application relates to a development which comprises of an activity requiring an industrial emissions licence. Ied licence no. Po117-01

Key dates

Timeline

  1. Application received16 March 2023
  2. Decision due10 May 2023
  3. Decision issued27 March 2023

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.