site adjacent to Texaco Service Station, Unit 15 Blanchardstown Corporate Park, Dublin 15
Construction of 5 electric vehicle charging stations with a solar canopy and substation.
FW23A/0076 · Fingal County Council · Lodged 29 March 2023
- Reference
- FW23A/0076
- Authority
- Fingal County Council
- Register status
- Decided
- Type
- Permission
- Received
- 29 March 2023
Summary
AI-generatedThe proposed development consists of 5 electric vehicle charging stations serving 10 charging bays, with 8 bays covered by a canopy structure featuring 74 square meters of integrated solar panels. The project also includes an ESB substation and substation kiosk.
- Floor area
- 74 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The proposed development will comprise; 5 no. Ev charging stations each serving 2 no. Vehicle charging bays, a total of 10 no. Charging points, 8 no. Bays are provided under a canopy structure with integrated roof mounted solar panels circa. 74 sqm surface area. The proposed development also incorporates 1 no. Esb substation & 1 no. Substation kiosk, with access and egress presented to the site and all associated directional road surface markings and above and below ground ancillary works.
Land-use zoning
What this land is zoned for
“Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment”
National zoning type: Office, business/technology park and related
Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received29 March 2023
- Decision due23 May 2023
- Decision issued15 May 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
1. Demolition works to the existing service station building (3.0sq.m
Texaco Service Station, Site 15C, Blanchardstown Corporate Park, 1 Tyr
FW18A/0099FingalLodged 9 Jul 2018Demolition
- Invalid30 m away
The proposed development will consist of (i) Installation of solar pho
Texaco Service Station, Unit 15C, Blanchardstown Corporate Park, Dubli
FW22A/0234FingalLodged 17 Oct 2022Energy
- Granted30 m away
The proposed development will consist of (i) installation of solar pho
Texaco Service Station, Unit 15C, Blanchardstown Corporate Park, Dubli
FW22A/0295FingalLodged 12 Dec 2022Energy
- Granted70 m away
The provision of 1 no. self-illuminated external sign to the South-East elevation at Site 15B, Tyrrelstown…
Site 15B, Tyrrelstown Link Road L3095, Blanchardstown Corporate Park, Dublin 15
FW23A/0032FingalLodged 21 Feb 2023Commercial
- Invalid70 m away
Planning permission for the provision of 1 no. self-illuminated external sign to the south-east elevation
Site 15B, Stemple Exchange, Tyrrelstown Link Road L3095, Blanchardstown Corporate Park, Blanchardstown, Dublin 15
FW23A/0384FingalLodged 18 Dec 2023Commercial
- Granted70 m away
Planning permission for the provision of 1 no. self-illuminated external sign to the South-East elevation
Site 15B, Stemple Exchange, Tyrellstown Link Road L3095, Blanchardstown Corporate Park, Blanchardstown, Dublin 15
FW24A/0030FingalLodged 29 Jan 2024Commercial
- Granted100 m away
For an amendment to the Condition 2 (ii) of the Notification of Grant
Site 15, Tyrrelstown Link Road L3095, Blanchardstown Corporate Park, D
FW18A/0174FingalLodged 22 Nov 2018Alterations
- Granted100 m away
The Development will consist of the construction of 2 no. office build
Site 15, Tyrellstown Link Road L3095, Blanchardstown Corporate Park, D
FW18A/0054FingalLodged 27 Jul 2018Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedInfrastructure
Electric Vehicle Charging Station consisting of 5 EV charging stations, each serving 2 vehicle charging bays,…
Site Adjacent Uniphar Group Premises, Block 645 & 646, Jordanstown Drive, Rathcoole, Co. Dublin
SD23A/0102South DublinLodged 9 May 2023
- GrantedCommercial
The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total…
Ashbourne Retail Park , Ballybin Road , Ashbourne Co. Meath.
2360184MeathLodged 26 Jul 2023
- GrantedInfrastructure
Development consisting of an Electrical Vehicle (EV) Charging Station, site of 0.14Ha. The development will…
Site 36 Lough Sheever Corporate Park , Robinstown , Mullingar
22416WestmeathLodged 15 Aug 2022
- GrantedInfrastructure
The proposed development will consist of a high-power electric vehicle charging points and associated…
Circle K Kilnamanagh Service Station, Mayberry Road, Tallaght, Dublin 24, D24 W82H
SD24B/0348WSouth DublinLodged 2 Aug 2024
- Awaiting decisionInfrastructure
An Electric Vehicle (EV) Charging Station on a site of ca. 0.017ha, consisting of 4 no. EV charging stations,…
Poppyfield Retail Park , Cahir Rd Ballingarrane , Clonmel Co. Tipperary
2560060TipperaryLodged 31 Jan 2025
- GrantedInfrastructure
An Electric Vehicle (EV) Charging Station, a site of ca. 0.017ha. The development will consist of 4 no. EV…
Poppyfield Retail Park , Cahir Rd Ballingarrane , Clonmel Co. Tipperary
2560136TipperaryLodged 25 Feb 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.