GrantedIndustrialDecided 10 November 2023

Horizon Logistics Park (known as Site G1), off the R108, at the townlands of Silloge and Harristown, St. Margaret's, Swords, Co. Dublin

Construction of a light industrial and logistics warehouse building in St. Margaret's.

FW23A/0278 · Fingal County Council · Lodged 15 September 2023

Reference
FW23A/0278
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
15 September 2023

Summary

AI-generated

The proposed development consists of a light industrial, warehouse, and logistics building (Unit G1) with a gross floor area of approximately 4,203 sq.m. The building will stand 14.8 metres high and include ancillary offices, 44 car parking spaces, and EV charging points.

Industrialwarehouselogisticsindustrial
Floor area
4,203 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • A natura impact statement (nis) will be submitted to the planning authority with the planning application and the nis will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the planning authority we, hpref dublin office devco 1 limited, intend to apply for planning permission for development at horizon logistics park (known as site g1), off the r108, at the townlands of silloge and harristown, st. Margaret's, swords, co. Dublin. The proposed development is located to the east of the development permitted under reg. Ref. : fw20a/0187 (known as the site n development), and to the southwest of the harristown bus depot. The proposed development consists of the following: o the construction of 1 no. Light industrial / warehouse (including wholesale use) / logistics building (unit g1) with a gross floor area (gfa) of c. 4,203 sq. M (including 656 sq. M of ancillary welfare and office space over two levels). The proposed building will have a main parapet height of c. 14.8 metres. O provision of 44 no. Car parking spaces (including 3 no. Disabled parking spaces and 5 no. Electrical vehicle parking spaces), 44 no. Bicycle parking spaces within bicycle shelter structures, and 5 no. Motorcycle spaces; o provision of an esb substation (with a ga of c. 35.75 sq. M) to the southeast of the main building
  • Provision of a service yard and loading bays to the east of the main building, bound by a 2.4m high fence. Provision of a recycling and bin store to the south of the service yard. Provision of access arrangements to the proposed development including an access from the estate road to the west of the site and provision of new cycle and pedestrian path alongside the estate road. Provision of landscaping and amenity space to the north and east of the site, planting, and boundary treatments. The proposal includes signage zones, pv panel zones at roof level, building plant, site lighting, security fencing, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems

Land-use zoning

What this land is zoned for

GE - General EmploymentSI
Provide opportunities for general enterprise and employment

National zoning type: Industrial, enterprise, employment

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 29 March 2024. A completion certificate was lodged on 14 April 2025.

Notified floor area: 4,203

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 September 2023
  2. Decision due9 November 2023
  3. Decision issued10 November 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.