Planning Permission Ireland
GrantedIndustrialDecided 11 January 2024

BMS Cruiserath, Cruiserath and Goddamendy Townlands, Cruiserath Road, Mulhuddart, Dublin 15

Construction of a new biopharmaceutical manufacturing building and laboratory extension in Mulhuddart.

FW23A/0342 · Fingal County Council · Lodged 10 November 2023

Reference
FW23A/0342
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
10 November 2023

Summary

AI-generated

The development includes a new two-storey biopharmaceutical manufacturing building of approximately 11,670 square metres with roof-mounted solar panels. It also features the refurbishment and extension of an existing laboratory, pedestrian links, and canopies.

Industrialbiotechsolarmanufacturing
Storeys
2
Floor area
12,959 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Eiar nis the development will consist of all site buildings and infrastructure required to support the new facility including; (a) a 2-storey biopharmaceutical development and manufacturing building sized approximately 11,670 square metres and approximately 15.5 metres high, with roof-mounted plant and equipment, including solar panels. (b) the refurbishment and extension of the existing 2-storey laboratory, to include ground-mounted and roof-mounted plant and equipment, including solar panels and an extension to the existing plant room at roof level sized approximately 115 square metres and approximately 9.1 metres high. (c) a single story pedestrian and materials link sized approximately 420 square metres and approximately 7 metres high from the proposed production building to the existing warehouse. (d) a single story pedestrian canopy from the proposed production building to the existing administration building, sized approximately 520 square metres and approximately 8.3 metres high. (e) a single storey pedestrian canopy from the proposed production building to the existing laboratory building, sized approximately 234 square metres and approximately 8.3 metres high. (f) provision of new car parking spaces including an additional 185 car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the r121. (g) proposed site infrastructure includes bunded tanks, pipe-bridges, sprinkler and water tanks, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, heat-pumps, underground pumping facilities, internal roads and paths, fencing and site lighting, and the use of the existing bms site entrances for heavy goods vehicles. (h) the development includes modifications to the existing internal road network. (i) proposed new landscaping includes new landscaped and planted areas, modifications, replacement and reinforcement of the existing landscaping. (i) proposed new signage based at ground level and on the proposed building façade. (k) the works will include temporary contractor compounds including temporary construction cabins, temporary car parking and the temporary use of existing site entrance road (currently not in use) to the north of the site from the cruiserath road, during construction activities. (l) proposed new surface water management infrastructure for the site, consisting of sustainable drainage features including a detention basin, rainwater harvest cisterns and distribution pipework. (m) modifications to existing buildings in the development and manufacturing campus including elevational alterations and modifications to the existing satellite administration, canteen and laboratory buildings to the south of the site, adjacent to the proposed development. (n) all associated site works. The proposed development will be built in 2 phases, with phase 2 comprising of approximately half of the proposed administrative floor area and the proposed pedestrian canopies to the existing administration and laboratory buildings. This application consists of a development for an activity for which a licence under part iv of the environmental protection agency act 1992 (as amended by the protection of the environment act, 2003) is required. An environmental impact assessment report (eiar) and a natura impact statement (nis) accompany this planning application, and they will be available for inspection or purchase at the office of the planning authority.

Land-use zoning

What this land is zoned for

HT - High TechnologyCOE
Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

National zoning type: Office, business/technology park and related

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 28 March 2024.

Notified floor area: 11,670

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 November 2023
  2. Decision due12 January 2024
  3. Decision issued11 January 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.