Planning Permission Ireland
GrantedInfrastructureDecided 11 April 2024

Damastown Industrial Park, Dublin 15, D15 K851

Construction of two single-storey electrical buildings, a transformer yard, and associated works at an industrial park.

FW24A/0068 · Fingal County Council · Lodged 21 February 2024

Reference
FW24A/0068
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
21 February 2024

Summary

AI-generated

The development at Damastown Industrial Park consists of constructing two single-storey electrical buildings raised 1.5 metres above ground level. The project also includes a transformer yard, fencing, underground trenches, and landscaping.

Infrastructureelectricalindustrialinfrastructure
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of 2 no. Single storey electrical buildings raised approximately 1.5m above ground level, a transformer yard, fencing, underground trenches, landscaping, and other associated site works.

Land-use zoning

What this land is zoned for

HT - High TechnologyCOE
Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

National zoning type: Office, business/technology park and related

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 2 September 2024.

Notified floor area: 50

2 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 February 2024
  2. Decision due16 April 2024
  3. Decision issued11 April 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.