Planning Permission Ireland
GrantedExtensionDecided 29 May 2024

124 Hazelbury Green, Castaheany, Dublin 15, D15 R9K2

Construction of a single-storey rear extension, attic conversion with a rear dormer, and widening of the vehicular access.

FW24A/0160 · Fingal County Council · Lodged 15 April 2024

Reference
FW24A/0160
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
15 April 2024

Summary

AI-generated

The project includes a single-storey ground floor extension to the rear with new rooflights, building up the existing gable to meet the ridge line, and a rear attic dormer to convert the attic space into a playroom/store. It also proposes widening the existing vehicular access.

Extensiondormerattic conversionextension

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of : a) a proposed single storey ground floor extension to the rear with 1 no. Proposed new rooflight and 1 no. New rooflight to the existing single storey roof to the rear. B) the build up of the existing gable to meet the existing ridge line with 1 no. Rooflight to the rear. C) a proposed new attic dormer to the rear elevation and conversion of the attic space to provide a playroom/store. D) the proposed widening of the existing vehicular access. E) and all associated site and boundary works.

Land-use zoning

What this land is zoned for

RS - ResidentialRS
Provide for residential development and protect and improve residential amenity

National zoning type: Existing residential

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
121 Hazelbury Green, Clonee, Dublin 15Jun 2026€533,00023 m
131 Hazelbury Green, Clonee, Dublin 15Aug 2025€508,00053 m
115 Hazelbury Green, Clonee, Dublin 15Feb 2026€603,00086 m
110 Hazelbury Green, Clonee, Dublin 15Jun 2025€480,00095 m
106 Hazelbury Green, Castheaney, Clonee Dublin 15Dec 2025€535,000106 m
70 Hazelbury Park, Clonee, Dublin 15Jul 2025€484,000130 m
70 Hazelbury Park, Clonee, Dublin 15Jul 2025€484,000130 m
37 Hazelbury Park, Clonee, Dublin 15not full market priceApr 2025€120,000154 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 April 2024
  2. Decision due7 June 2024
  3. Decision issued29 May 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.