Planning Permission Ireland
GrantedExtensionDecided 16 January 2026

245 Littlepace Court, Dublin 15, D15 H9P9

First-floor side extension over an existing ground-floor extension in Dublin 15.

FW25A/0483E · Fingal County Council · Lodged 13 November 2025

Reference
FW25A/0483E
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
13 November 2025

Summary

AI-generated

The development consists of a first-floor side extension with a pitched roof to match the existing roof, built above an existing ground-floor side extension. The works also include new rooflights to the front and rear.

Extensionextensionrooflights
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of first floor side extension with pitched roof to match existing roof, above existing ground floor side extension. Works to include new rooflights to front and rear elevations.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
244 Littlepace Court, Clonee, Dublin 15Jun 2025€655,00011 m
252 Littlepace Court, Clonee, DublinSept 2025€595,00025 m
168 Littlepace Walk, Littlepace, CloneeApr 2026€370,00081 m
175 Littlepace Woods, Clonee, Dublin 15May 2025€601,000101 m
96 Hazelbury Green, Clonee, Dublin 15Jan 2026€480,000160 m
5 Beechfield Place, Castaheany, Clonee Dublin 15Sept 2025€364,000172 m
35 Beechfield Meadows, Clonee, Dublin 15Dec 2025€322,000216 m
92 Littlepace Woods, Clonee, Dublin 15Jan 2025€504,000219 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 November 2025
  2. Decision due16 January 2026
  3. Decision issued16 January 2026

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.