Planning Permission Ireland
GrantedCommercialDecided 21 April 2026

Blanchardstown Centre, Blanchardstown Town Centre, Coolmine, Dublin 15

Amendments to a permitted development at Blanchardstown Centre, including canopy and cafe unit alterations.

FW26A/0072E · Fingal County Council · Lodged 25 February 2026

Reference
FW26A/0072E
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
25 February 2026

Summary

AI-generated

The application proposes amendments to a permitted development at the Blue Mall entrance and plaza. Changes include adding a timber and steel canopy over the plaza and reconfiguring cafe/restaurant units to provide nine units in total.

Commercialretailamendmentrestaurant

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for amendments to the development permitted under reg. Ref. : fw25a/0349e at the blanchardstown centre, blanchardstown town centre, coolmine, dublin
  • The application site relates to the existing blue mall entrance and public plaza area, existing esb substation, units 309 and 500 within the blanchardstown centre, part of the leisureplex surface car park, the blue mall multi-storey car park entrance area, a section of road d and associated landscaped area to the south. The proposed amendments comprise the following
  • Alterations to the permitted blue mall extension to provide a timber and steel canopy above the external mall plaza and flanked either side by the café/restaurant units and associated works
  • Alterations to the permitted extension, including alterations and reconfiguration of the permitted café/restaurant units, including the subdivision of permitted unit 734 into 2 no. Café/restaurant units (units 734 and 738). This results in the total provision of 9 no. Café/restaurant units in total. Associated alterations to the elevations, permitted signage zones, outdoor terraces areas, materials façade and fenestration arising from the above
  • Minor alteration to the permitted building massing and parapet heights, with no increase in overall scale (from 74.55 m to 74.3 m)
  • Provision of an led digital display screen (measuring 13.3 m x 4.5 m in area) positioned above the upgraded entrance to the existing internal mall and associated alterations to the blue mall entrance
  • Alterations to the 2 no. Permitted kiosk zones within the external mall plaza area, including an increase in the maximum cumulative area of the kiosk zones (not to exceed 224 sq. M in total). Associated alterations to the external mall seating and landscaping, and all other associated site development works within the external mall plaza area
  • Proposed revision to condition no. 3 under reg. Ref. : fw25a/0349e to expand the permitted uses of the kiosk areas to include for occasional events (in addition to class 1 (shop) or class 2 (services) and/or restaurant/café/takeaway)
  • Revised landscaping to the public plaza and hard and soft landscape areas, including the provision of a two way cycle lane and the provision of a backlit totem sign (measuring 1.4m x 4.9m x 0.2m) within the public plaza area
  • Alteration to the extent of demolitions with the parapet and entrance doors to a remote store retained on the south east elevation of the blue mall service yard and alteration to the ramp to the blue mall service yard entrance, with the existing entrance gate refurbished and re-aligned
  • The proposed amendments include an extension of the application site boundary; and
  • All associated ancillary amendments, including reconfiguration of plant area and plant screen at roof level, provision of external stairs, revised materials to the esb substation, foul and surface water drainage, and all associated development and ancillary works

Land-use zoning

What this land is zoned for

MC - Major Town CentreRV
Protect, provide for and/ or improve major town centre facilities

National zoning type: Built up area

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 Grove Court, Blancherstown, Dublin 15Sept 2025€330,000219 m
4 Westend Village, Snugborough Road, BlanchardstownFeb 2025€300,000296 m
12 Westend Village, Blanchardstown, Dublin 15Jun 2025€285,000296 m
6 Westend Village, Snugborough Rd, Blanchardstown Dublin 15Mar 2026€345,000296 m
27 Westend Village, Blanchardstown, Dublin 15Nov 2025€306,000309 m
135 Westend Village, Snugborough Rd, Blanchardstown Dublin 15Jan 2026€255,000332 m
56 Westend Village, Snugborough Rd, Blanchardstown Dublin 15Jun 2026€387,000339 m
Apt 8 Greenbriar, Verdemont, BlanchardstownMay 2026€261,000344 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 February 2026
  2. Decision due21 April 2026
  3. Decision issued21 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.