GrantedInfrastructureDecided 6 July 2026

The public road network along the R149, passing partly through the townlands of Allenswood, St. Catherines Park, Coldblow, Westmanstown, and Passifyoucan Co. Dublin.

Installation of a 2.3 km underground watermain along the R149 road network.

FW26A/0196E · Fingal County Council · Lodged 11 May 2026

Reference
FW26A/0196E
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
11 May 2026

Summary

AI-generated

The project involves installing approximately 2.3 km of underground watermain pipes to replace existing smaller mains. The works will take place within the public road network along the R149 and include all associated valves, meters, and chambers.

Infrastructurewatermaininfrastructureutilityroadworks

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for a c. 2.3 km section of an underground watermain, located within the public road network along the r149, passing partly through the townlands of allenswood, st. Catherines park, coldblow, westmanstown, and passifyoucan co. Dublin. The development will comprise of: installation of a new water supply main of approximately 1760m of 250mm dia. Upvc pipe to replace an existing 75mm upvc main; installation of a new water supply main of approximately 530m of 250mm dia. Upvc pipe to replace an existing 100mm upvc main; a section of an existing 100mm dia. Main to be decommissioned and rerouted to the existing 355mm main; and all associated underground connections, including valves, hydrants, meters, and associated chambers and chamber covers, and all ancillary site development and infrastructure works.

Land-use zoning

What this land is zoned for

OS - Open SpaceOS
Preserve and provide for open space and recreational amenities

National zoning type: Active open space

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received11 May 2026
  2. Decision due7 July 2026
  3. Decision issued6 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.