Hynes Building, St Augustine Street, Galway
Alterations and a new fourth floor extension at the Hynes Building.
16289 · Galway City Council · Lodged 25 October 2016
- Reference
- 16289
- Authority
- Galway City Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 25 October 2016
Summary
AI-generatedThe development consists of internal alterations, infilling lightwells, and altering the front entrance of the Hynes Building. It also includes constructing a new set-back fourth floor of 1,358 sq m with roof plant, and a change of use for 359 sq m at ground floor level.
- Storeys
- 4
- Floor area
- 1,358 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for development at a 0.24 ha site approximately (a three storey building, with roof plant). The application site includes a walled area on the north-eastern side of st clare's walk, which accommodates tank storage. The principal part of the site is principally bounded by st augustine street to the northwest; st clare's walk to the northeast; merchants road to the southeast; and st augustine house to the southwest. (for clarity, the existing ground floor library use is unchanged in this planning application). The development will consist of alterations to the existing floor area within the building envelope through the: removal and infill of stairs between ground and first floor levels; infill of an existing internal lightwell at first floor level, and the amendment of an existing internal lightwell at second floor and roof level; alterations to the front entrance and associated entrance tower at st augustine street. The development will also consist of: the construction of a new set back fourth floor (1,358 sq m), roof plant and associated screening at roof level; the change of use of 359 sq m at ground floor level (excluding library) from class 2 offices (where the services are provided principally to visiting members of the public) to class 3 offices; elevational alterations, including revisions to doors and windows; and all site development works above and below ground. The entire development will result in a four storey building with roof plant (total gross floor area c. 6,836 sq m (an increase of c. 1,363 sq m))
Land-use zoning
What this land is zoned for
“To Provide for city centre uses”
National zoning type: City/Town/village Centre, central area
Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Apt 1 Floor 4, St Augustine Court, St Augustine St | Oct 2025 | €261,000 | 58 m |
| 25 The Cornstore, Middle St, Galway City | Apr 2026 | €420,000 | 62 m |
| 10 Hynes Yard, Merchants Rd, Galway | Nov 2025 | €420,000 | 77 m |
| 12 Hynes Yard, Merchants Rd, Galway | Dec 2025 | €376,000 | 77 m |
| Apt 2, Hynes Yard, Merchants Rd | Jun 2025 | €400,000 | 77 m |
| Apt 2, Merchants Quay, Merchants Road | Aug 2025 | €325,000 | 80 m |
| 8 Merchants Quay, Merchants Rd, Galway | Mar 2026 | €375,000 | 80 m |
| 22 Middle Street, Galway | Nov 2025 | €600,000 | 91 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received25 October 2016
- Decision due19 December 2016
- Decision issued19 December 2016
- Grant issued26 January 2017
- Permission expiry25 January 2022
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Permission for development for external façade signage on the ground floor. The site is principally bounded…
Hynes Building , St. Augustine Street , Galway
17149Galway CityLodged 7 Jun 2017Commercial
- GrantedAt this site
Permission for development which will consist of; a three to six storey building (total gross floor area 7768…
Hynes Building St. Augustine Street Galway , The site is principally bound by St.augustine Street to the northwest , St. Clare's walk to the northwest; Merchants Road to the southeast and St Augustine House
20346Galway CityLodged 18 Dec 2020Commercial
- RefusedAt this site
Permission for the development which will consist of a three to seven storey building (total gross floor area…
Hynes Building , St. Augustine Street , Galway
19200Galway CityLodged 12 Jul 2019Commercial
- Granted30 m away
Permission for development at a 0.24 ha site approximately, known as the Hynes Building, St. Augustine…
Hynes Building , St Augustine St , Galway
16223Galway CityLodged 3 Aug 2016Alterations
- Granted30 m away
Permission for a change of use at ground floor level from office use to use as a hyperbaric oxygen centre.…
Augustine House , Merchants Road , Galway
16363Galway CityLodged 23 Dec 2016Change of use
- Granted40 m away
Permission for development which consists of: the applicant intends to apply for planning permission for…
2 Rockfort House , Augustine Street , Galway
2660158Galway CityLodged 15 May 2026Alterations
- Granted40 m away
Permission for development which will consist of a) the change of use of a ground floor office unit to…
Augustine House , Merchants Road , Galway
20334Galway CityLodged 14 Dec 2020Change of use
- Granted50 m away
Permission for development which will consist of the removal of existing 'MAZARS' signage fascia (c.3.32…
Mayorality House , Flood Street and Merchants Road , Galway
20224Galway CityLodged 3 Sept 2020Alterations
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedCommercial
Permission for the development which will consist of a three to seven storey building (total gross floor area…
Hynes Building , St. Augustine Street , Galway
19200Galway CityLodged 12 Jul 2019
- GrantedCommercial
Permission for development which will consist of; a three to six storey building (total gross floor area 7768…
Hynes Building St. Augustine Street Galway , The site is principally bound by St.augustine Street to the northwest , St. Clare's walk to the northwest; Merchants Road to the southeast and St Augustine House
20346Galway CityLodged 18 Dec 2020
- GrantedExtension
Permission for development which consists of the construction of a part single,part two storey extension with…
Kilbarrack Health Centre, Greendale Shopping Centre, Foxfield Crescent, Kilbarrack, Dublin 5
3483/21Dublin CityLodged 8 Sept 2021
- InvalidApartments
The development will principally consist of: the partial change of use at ground floor level from retail to…
0.0137 Ha site at Nos. 24 & 25 George's Street Lower, Dun Laoghaire, Co. Dublin, A96 HY26., The site also incorporates the first floor of No. 26A George's Street Lower
D24A/0861Dún Laoghaire–RathdownLodged 25 Oct 2024
- GrantedAlterations
Permission for development at a 0.24 ha site approximately, known as the Hynes Building, St. Augustine…
Hynes Building , St Augustine St , Galway
16223Galway CityLodged 3 Aug 2016
- GrantedAlterations
Revisions to development permitted under previously granted permission Register References SD03A/0320 and…
Site of 3.256 ha. to the southwest of junction of Whitestown Way & Tallaght Bypass in the townland of Whitestown, Tallaght, Dublin 24
SD06A/0886South DublinLodged 8 Feb 2007
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.