Planning Permission Ireland
GrantedCommercialDecided 27 October 2017

Former Topaz Oil Storage Facility, Located at Dock Road, Queen Street

A large mixed-use office development across multiple blocks on a former oil storage site.

1783 · Galway City Council · Lodged 3 April 2017

Reference
1783
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
3 April 2017

Summary

AI-generated

A 10-year permission is sought for a major mixed-use office development of approximately 34,765 square meters on a 0.93-hectare site. The project features multiple blocks up to 8 storeys high, including retail, restaurant, and café spaces, a basement level, and solar panels.

Commercialofficeretailsolarredevelopment
Storeys
8
Floor area
34,765 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for a 10 year permission for development at this site (c. 0.93ha). The proposed development consists of a mixed use office development (c. 34,765 sq. M gia excluding basement, external terraces and open roof plant) provided in 4 no. Blocks over a single basement level as follows: block a (c. 9,935 sq. M) is a 8 storey building, located in the north-west part of the site adjoining dock road/queen street containing retail/restaurant/café use and esb sub-station at ground level; office use at ground level to level 07; plant at level 07; external terraces at levels 04 to 06 with a roof garden at level 07; solar panels on the roof. Block b (c. 4,820 sq. M) is a 7 storey building with roof plant above, located in the south-west corner of the site adjoining dock road and bothar na long, containing the basement access ramp; retail/restaurant/café use at ground level and mezzanine level; office use at ground level to level 06; external terraces at level 01 to 06 with external links with block c, roof garden at level 07; solar panels on the roof. A bridge link is provided at level 04 between block a and b. Block c (c. 8,165 sq. M) is a 8 storey building with roof plant above, located in the southern part of the site adjoining bothar na long containing retail/restaurant/café use at ground floor level; office use at ground level to level 07; external terraces at levels 01 to 06 with external links to block b and d, public accessible roof and event space at level 07, roof garden at level 08; solar panels on the roof. Block d (c. 11,845 sq. M) is a 8 storey building with roof plant above, located along the eastern boundary of the site adjoining bothar na long to the south, containing office use at ground level to level 07; external terraces at level 01 to level 07 with external links to block c, roof garden at level 08; solar panels on the roof. The single basement level (c. 7,030 sq. M) contains 138 no. Car spaces; 162 no. Cycle spaces; a commuter centre, office lobby areas, building facilities and plant. External amenity space is provided at ground level comprising a raised central plaza, basement ventilation areas, 52 no. Surface cycle spaces and public realm improvements to the north and west of the site. Vehicle access is from dock road; fire tender access is from dock road/queen street and the proposed public realm to the north; and pedestrian access is from dock road, bothar na long and the proposed public realm to the north. The proposed ...

Land-use zoning

What this land is zoned for

City CentreUC
To Provide for city centre uses

National zoning type: City/Town/village Centre, central area

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
27 Barr Taoide, Galway, GalwayMay 2026€330,00065 m
Apt 29, Barr Taoide, DocksJul 2025€343,00065 m
6 Barr Taoide, Queens Gate, GalwayFeb 2026€328,00065 m
2 Nicholas St, Merchants Rd, GalwayJul 2025€345,000103 m
7 St Nicholas St, New Docks, GalwayFeb 2025€310,000105 m
19f Merchants Road, GalwayDec 2025€385,000142 m
Apt 2, Hynes Yard, Merchants RdJun 2025€400,000156 m
10 Hynes Yard, Merchants Rd, GalwayNov 2025€420,000156 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 April 2017
  2. Further information requested25 May 2017
  3. Further information received14 September 2017
  4. Decision due29 October 2017
  5. Decision issued27 October 2017
  6. Appeal submitted22 November 2017
  7. Appeal decided31 August 2019
  8. Permission expiry30 August 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.