Planning Permission Ireland
GrantedApartmentsDecided 20 June 2019

105 Salthill Upper, Galway city

Demolition of a house to build a 39-unit apartment complex in Salthill, Galway.

18343 · Galway City Council · Lodged 31 October 2018

Reference
18343
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
31 October 2018

Summary

AI-generated

The project involves the demolition of an existing house and the construction of an infill apartment complex containing 39 apartments. The development will feature two blocks ranging from 3 to 8 storeys over basement, including a community room, roof garden, solar panels, and basement parking.

Apartmentsapartmentsdemolitionsolarbasement
Residential units
39
Storeys
8

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development which will consist of (1) demolition of the existing house (2) redevelopment of the proposed site to accommodate an infill apartment complex - the proposed development will include 39 no. Apartments, together with associated balconies. The proposed development is arranged in 2 no. Blocks, resulting in a 3
  • 4 storey building over basement, fronting onto salthill road upper (block b) and a 6-8 storey building over basement fronting onto toft park (block a), - block b will consist of 11 no. 1 - bed apartments a 1 no. 3- bed apartment with a winter garden/balcony at penthouse level, together with a concierge room and a esb/switch room to be provided at ground level. - block a will consist of 26 no. 2-bed apartments a 1 no. 3-bed apartment together with a community room with a roof garden & patio at penthouse level and a solar pv panel array at roof level. Revised vehicular access and building signage onto the salthill road upper (r864). Car parking spaces, refuse compound and storage for apartments to be provided at basement level. Site landscaping including the provision of courtyard garden area, with art sculpture and play area at surface/ground level. Revised boundary treatments and revised access arrangements for pedestrians, wheelchairs and cyclists and associated bicycle parking. Provision of ancillary works including a rainwater harvesting system and connection to existing foul sewer network & public mains, together with all other site works and services

Land-use zoning

What this land is zoned for

ResidentialRS
To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods

National zoning type: Residential, mixed residential and other uses

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 37, Cova Da Iria, 105 Upper SalthillMay 2025€740,00021 m
Apt.17, Cova Da Iria, 105 Upper SalthillJun 2025€490,00021 m
85 Lower Salthill, GalwayNov 2025€780,00027 m
7 Pointe Boise, Upper Salthill, GalwayJul 2025€460,00035 m
14 Pointe Boise, 107 109 Lower Salthill, GalwayApr 2026€326,00035 m
21 Pointe Boise, 107 109 Upper Salthill, GalwayMar 2025€292,50035 m
31 Pointe Boise, Salthill, Co GalwayJul 2025€750,00035 m
12 Galway Bay Apts, Upper Salthill, GalwayDec 2025€465,00072 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 October 2018
  2. Further information requested21 December 2018
  3. Further information received24 May 2019
  4. Decision due20 June 2019
  5. Decision issued20 June 2019
  6. Appeal submitted15 July 2019
  7. Appeal decided1 November 2019
  8. Permission expiry31 October 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.