Planning Permission Ireland
GrantedExtensionDecided 26 April 2018

139 Rahylin Glebe, Ballybane, Galway

Demolition of a side extension and carport to build a new two-storey side extension and single-storey rear extension.

1860 · Galway City Council · Lodged 5 March 2018

Reference
1860
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
5 March 2018
Residential units
1
Floor area
100 m²

Summary

AI-generated

The development involves the demolition of an existing single-storey side extension and carport. These will be replaced with a new two-storey pitched roof side extension and a single-storey flat-roofed rear extension.

Extensionextensiondemolitionresidential
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission to demolish existing single storey side extension and carport and replace same with a new two storey pitched roof side extension and single storey flat roofed rear extension and all associated site works and amendments (variation to previously approved development under planning reg. Reference 15/108).

Land-use zoning

What this land is zoned for

ResidentialRS
To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods

National zoning type: Residential, mixed residential and other uses

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 1 November 2021.

Notified floor area: 242

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
158 Rahylin Glebe, Ballybane, GalwayFeb 2025€230,00036 m
3 Bayview Heights, Ballybane, GalwaySept 2025€290,00089 m
Unit 174 Glasan Student Village, Ballybane Rd, MervueJun 2026€190,000107 m
Unit 172 Glasan Student Village, Ballybane Rd, MervueOct 2025€195,000107 m
Unit 169 Glasan Student Village, Ballybane Rd, MervueJun 2026€190,000107 m
Unit 168 Glasan Student Village, Ballybane Rd, MervueApr 2026€187,500107 m
Unit 170 Glasan Student Village, Ballybane Rd, MervueJun 2026€190,000107 m
Unit 173 Glasan Student Village, Ballybane Rd, MervueJun 2026€190,000107 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 March 2018
  2. Decision due29 April 2018
  3. Decision issued26 April 2018
  4. Grant issued29 May 2018
  5. Permission expiry28 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.