Planning Permission Ireland
RefusedApartmentsDecided 31 October 2019

No. 7 and No. 9 Upper Newcaslte Road, Galway

Conversion and extension of two semi-detached houses into 12-bedroom student accommodation in Galway.

19258 · Galway City Council · Lodged 10 September 2019

Reference
19258
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
10 September 2019

Summary

AI-generated

Planning permission is sought to merge and refurbish two semi-detached houses into a 3-storey building containing 3 apartments for student accommodation. The project involves demolishing rear annexes, constructing a new 3-storey rear extension, and reconstructing the attic space.

Apartmentsstudent housingdemolitionextension
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for (a) refurbishment/ part reconstruction and merging of 2 no. Semi- detached houses to form a 12 bedroom student accommodation, in the form of 3 apartments, in a single 3 storey building (b) demolition of the rear two storey annexes of both existing houses (c) construction of a new rear three storey extension (d) reconstruction of existing converted attic space of houses no. 7 and no. 9 to be merged with the new rear three storey extension (e) all elevations changes (f) construction of a bin store and covered bike stand (g) all associated building works and site works

Land-use zoning

What this land is zoned for

ResidentialRS
To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods

National zoning type: Residential, mixed residential and other uses

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Cova, Snipe Ave, NewcastleNov 2025€400,00036 m
Mac Dara, 1 Upper Newcastle, GalwayJul 2025€660,00039 m
11 Snipe Lawn, Newcastle, GalwaySept 2025€550,00090 m
23 Upper Newcastle, Newcastle, GalwayJun 2026€425,000112 m
1 Snipe Lawn, Newcastle, GalwayMay 2025€760,000116 m
Grafton House, 27 Upper Newcastle, GalwayFeb 2025€600,000127 m
Grafton House, 27 Upper Newcastle, GalwayJun 2026€890,000127 m
31 Upper Newcastle, Newcastle, GalwayNov 2025€595,000163 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 September 2019
  2. Decision due4 November 2019
  3. Decision issued31 October 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.