Planning Permission Ireland
GrantedChange of useDecided 20 February 2020

Castlepark Road, Ballybane, Galway

Retention of elevation changes and permission to convert part of an enterprise centre into offices with a new stairwell extension.

19370 · Galway City Council · Lodged 20 December 2019

Reference
19370
Authority
Galway City Council
Register status
Decided
Type
RETENTION
Received
20 December 2019
Residential units
1
Floor area
100 m²

Summary

AI-generated

This application seeks retention for minor elevation changes, boundary wall removal, and stairwell demolition. It also requests permission to change the use of 974 sqm of an enterprise centre to offices and construct a new two-storey stairwell extension.

Change of useofficeretentionextension
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development will consist of retention of (1) minor changes to existing building elevations including, alterations to existing window & door openings, (2) removal of portion of boundary wall, (3) demolition of external stairwell, and permission for (i) change of use of part of ground floor, first floor and second floor from existing enterprise centre to office (area for change of use 974 sqm). (ii) construction of new two storey stairwell extension (gross floor area 31 sqm). (iii) doubled-sided standalone pole sign, (iv) construction of all ancillary site features, including signage, car parking, boundary treatment and associated site works

Land-use zoning

What this land is zoned for

Enterprise Light Industry and CommercialSI
To provide for light industry and commercial uses other than those reserved in the CC zone

National zoning type: Industrial, enterprise, employment

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 6 August 2020.

Notified floor area: 1,005

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
234 Castle Park, Ballybane, GalwayJun 2025€126,000222 m
18 Rian Luachra, Ballybane, GalwayJul 2025€360,000253 m
2 Shruthan Mhuirlinne, Ballybane, GalwayApr 2026€260,000269 m
216 Castle Park, Ballybane, Galwaynot full market priceMay 2026€285,000277 m
6 Ard Alainn, Ballybane, GalwaySept 2025€295,000312 m
35 Coillte Mhuirlinne, Ballybane, GalwayMar 2025€340,100326 m
32 Glasan Student Village, Gmit, Co GalwayNov 2025€271,000334 m
14 Sliabh Rua, Ballybane, GalwayApr 2025€285,000347 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2019
  2. Decision due22 February 2020
  3. Decision issued20 February 2020
  4. Grant issued26 March 2020
  5. Permission expiry25 March 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.