Planning Permission Ireland
GrantedChange of useDecided 21 May 2019

Former A.P.C Site, Ballybrit Business Park, Ballybane Beg

Change of use from industrial to office, with a new canteen, fitness centre, courtyard, and extension.

1994 · Galway City Council · Lodged 28 March 2019

Reference
1994
Authority
Galway City Council
Register status
Decided
Type
RETENTION
Received
28 March 2019

Summary

AI-generated

Permission and retention permission are sought for works to a former industrial building. This includes a change of use of 1,305 sqm to offices, a new canteen, a corporate fitness centre, an internal courtyard, a 40 sqm extension, and various external alterations.

Change of useofficeindustrialretention
Floor area
1,345 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission and permission for retention for development which consists of works to the former apc building including; the change of use of 1,305m2 from industrial to office and associated elements. Permission is sought for a proposed canteen and corporate fitness centre, construction of an internal courtyard, construction of a 40m2 building extension to the north elevation with spilt level external terrace, construction of a compactor yard, fire exit stair and, service lift including alterations to the north façade and existing loading dock exit door, the construction of 3 no. Accessible car parking spaces to the west. Retention is sought of 2 no. Windows along the north façade, 10 no. Accessible car parking spaces, accessible entrance ramp and steps at the main entrance of the building and a sloped access, stepped approach and planting along the west elevation. Permission will also be sought for amendments to previous planning applications reference nos. :17/278, 18/308 and 18/202, to include alterations to car parking spaces at the north and west side of the building, the inclusion of 1no. Electric car charging point to the west of the building and relocation of a wc block within the approved office space

Land-use zoning

What this land is zoned for

Enterprise Industry and Related UsesSI
To provide for Enterprise, Industral and Related uses

National zoning type: General industry

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 19 August 2019.

Notified floor area: 2,670

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 March 2019
  2. Decision due22 May 2019
  3. Decision issued21 May 2019
  4. Grant issued26 June 2019
  5. Permission expiry25 June 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.