GrantedCommercialDecided 24 February 2022

Site 4 Briarhill Business Park, Bothar na dTreabh, in the townlands of Ballybrit and Doughiska

Construction of an eight-storey, 186-bedroom hotel with spa and leisure facilities at Briarhill Business Park.

20218 · Galway City Council · Lodged 20 August 2020

Reference
20218
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
20 August 2020

Summary

AI-generated

The proposed development consists of an eight-storey over basement hotel with a gross floor area of approximately 12,478 square metres. It will feature 186 bedrooms, a restaurant, bar, meeting rooms, gym, and spa facilities including a swimming pool.

Commercialhotelcommercialleisure
Storeys
8
Floor area
12,478 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for the development which will consist of construction of an eight storey over basement, 186 no. Bedroom hotel with below ground pool plant equipment, tank room, standby generator and pumping station (gross floor area: c. 12,478sqm). The development includes for hotel uses on the ground floor including a reception area, lounge area, a restaurant, a bar, a lobby, toilet facilities, and back of house rooms. The ground floor also includes an lv switchroom, an mv switchroom, an esb substation, a transformer/lv switchroom, a public entrance to the spa and spa facilities including a swimming pool, a whirlpool, a sauna/steam room, male and female changing rooms, and storage rooms. The first floor incorporates spa facilities including a treatment room, a studio, a gym, a lobby area, a storage area, 8 no. Meeting rooms with associated reception area, an office, toilet facilities and a pantry. The upper floors incorporate 186 no. Hotel bedrooms. The development also includes for a green roof, emergency fire escapes, an upgrade to the existing entrance/exit from the business park campus, new guest vehicle entrance from the business park campus to the north of the site, 2 no. New vehicle entrances from the west of the site, 153 no. Car parking spaces, 3 no. Set down spaces at the main entrance, service entrance layby to the west of the site, 28 no. Cycle spaces, electrical vehicle charging spaces, pumping station kiosk, signage, associated landscaping and boundary treatments, and all other site development works and services ancillary to the proposed development

Land-use zoning

What this land is zoned for

Enterprise Light Industry and CommercialSI
To provide for light industry and commercial uses other than those reserved in the CC zone

National zoning type: Industrial, enterprise, employment

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
17 Rinn Lia, Old Ballybrit Rd, BallybritFeb 2025€308,000229 m
16 Cuirt Na Rasai, Ballybrit, GalwayApr 2026€340,000271 m
33 C�irt Na Rasa�, Ballybrit, GalwayDec 2025€150,000271 m
1 Cuirt Na Rasai, Ballybrit, GalwayOct 2025€230,000271 m
Cuirt Na Rasai, Ballybrit, GalwayFeb 2025€220,000271 m
29 Cuirt Na Rasai, Ballybrit, GalwayDec 2025€230,000271 m
10 Cuirt Na Rasai, Ballybrit, GalwayMar 2026€350,000271 m
30 Cuirt Na Rasai, Ballybrit, GalwayApr 2026€225,000271 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 August 2020
  2. Further information requested13 October 2020
  3. Further information received30 November 2021
  4. Decision due24 February 2022
  5. Decision issued24 February 2022
  6. Appeal submitted23 March 2022
  7. Appeal decided3 January 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.