Planning Permission Ireland
GrantedExtensionDecided 31 March 2022

19 Binn Bhán, Western Distructor Road, Knocknacarra

Construction of a rear extension, attic conversion, external insulation, solar panels, and an EV charging point.

21393 · Galway City Council · Lodged 26 November 2021

Reference
21393
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
26 November 2021
Residential units
1
Floor area
100 m²

Summary

AI-generated

This domestic development includes building a rear extension and converting the attic into habitable rooms. It also features external rendered insulation, replacement doors and windows, roof lights, solar panels, and an EV charging point.

Extensionextensionsolarev chargingretrofit

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development which will consist of the construction of a rear extension, convert the attic into habitable rooms, provide external rendered insulation to the existing front, rear and side elevations, replace the existing doors and windows, provide roof lights, solar panels on the existing and new roofs, provide an e. V. Charging point in the front garden and all associated works

Land-use zoning

What this land is zoned for

ResidentialRS
To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods

National zoning type: Residential, mixed residential and other uses

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Tor Bui, Cappagh Rd, BarnaFeb 2026€705,000119 m
16 Tor Bui, Cappagh Rd, GalwayOct 2025€450,000160 m
Apartment 108, Ard Raithn�, BearnaJan 2026€371,499200 m
124 Manor Court, Knocknacarra, GalwayJan 2025€268,000247 m
130 Manor Court, Knocknacarra, GalwayDec 2025€275,000264 m
99 Leargan, Ballymoneen West, KnocknacarraJan 2026€415,000291 m
13 Fana Burca, Knockcarra, Co GalwayDec 2025€300,000300 m
14 Fana Burca, Knocknacarra, GalwayDec 2025€290,000300 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 November 2021
  2. Further information requested26 January 2022
  3. Further information received9 March 2022
  4. Decision due5 April 2022
  5. Decision issued31 March 2022
  6. Grant issued6 May 2022
  7. Permission expiry5 May 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.