Planning Permission Ireland
GrantedEnergyDecided 1 April 2022

Alice Perry Engineering Building, NUIG Upper Newcastle Campus, Galway

Drilling of 18 geothermal boreholes and installation of heating equipment at the Alice Perry Engineering Building, NUIG.

2228 · Galway City Council · Lodged 21 February 2022

Reference
2228
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
21 February 2022
Residential units
1
Floor area
100 m²

Summary

AI-generated

This application proposes the drilling of 18 geothermal boreholes and associated excavation works for a pipeline system to a heat exchanger. It also includes installing a Dry Air Heater unit on the roof of the Alice Perry Engineering Building, supported by a Natura Impact Statement.

Energygeothermaluniversityheatingnis

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development which will consist of
  • The drilling of 18 no. Geothermal boreholes
  • Ground excavation works to facilitate a pipeline system connecting the boreholes to a heat exchanger unit located inside the alice perry engineering building
  • The installation of a dry air heater (dah) unit on the roof of the alice perry engineering building
  • All associated and ancillary site works. A natura impact statement is included with this application

Land-use zoning

What this land is zoned for

Community Culture and InstitutionalCI
To provide for institutional and community facility use

National zoning type: Community facilities

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
31 Upper Newcastle, Newcastle, GalwayNov 2025€595,000211 m
Grafton House, 27 Upper Newcastle, GalwayJun 2026€890,000228 m
Grafton House, 27 Upper Newcastle, GalwayFeb 2025€600,000228 m
23 Upper Newcastle, Newcastle, GalwayJun 2026€425,000233 m
22 Moyola Park, Newcastle, GalwayMay 2025€600,000249 m
6 Gort Ciuin, Moyola Park, NewcastleMay 2026€379,000249 m
Ceann Scribe, An Boithrin, 51 Upper NewcastleAug 2025€430,555262 m
73a Upper Newcastle Rd, Galway, Co GalwayJul 2025€640,000266 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 February 2022
  2. Decision due17 April 2022
  3. Decision issued1 April 2022
  4. Grant issued31 May 2022
  5. Permission expiry30 May 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.