Planning Permission Ireland
GrantedChange of useDecided 21 February 2023

Boston Scientific, Building 2, Ballybrit Business Park

Change of use from industrial to office space and construction of a central utility building at Boston Scientific.

232 · Galway City Council · Lodged 6 January 2023

Reference
232
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
6 January 2023

Summary

AI-generated

The project involves converting 858 sqm of industrial space to office use within Building 2. It also includes constructing a two-storey external central utility building, demolishing three redundant utility buildings, and installing an overhead pipe rack.

Change of useofficeindustrialdemolition
Storeys
2
Floor area
1,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development which consists of (i) the change of use from industrial to office use of 858sqm within the existing building 2 (identified as mod
  • On the site; (ii) provision of roof mouthed plant, stacks, perimeter handrail, and roof lights on mod 2 (iii) alterations to the east and west facades of mod 2 (iv) the construction of an external 2 storey central utility building (cub) with a floor area of 1000sqm and an external fenced utility yard ; the associated proposed works include ; demolition of no. 3 external existing redundant utility buildings ; alterations to existing internal roads and pedestrian footpaths ; site lighting ; installation of an overhead pipe rack between mod 2 and the proposed (cub) ; the provision of underground services and surface water management infrastructure ; landscaping and associated site works

Land-use zoning

What this land is zoned for

Enterprise Industry and Related UsesSI
To provide for Enterprise, Industral and Related uses

National zoning type: General industry

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
3 The Meadows, Ballybrit, GalwayFeb 2025€416,000367 m
52 The Meadows, Ballybrit, GalwayJun 2025€409,000407 m
27 Cla� M�r, Old Monivea Road, Ballybritprice excludes VATMay 2025€421,586421 m
29 Cla� M�r, Old Monivea Road, Ballybritprice excludes VATMay 2025€421,586421 m
30 Cla� M�r, Old Monivea Road, Ballybritprice excludes VATMay 2025€421,586421 m
31 Cla� M�r, Old Monivea Road, Ballybritprice excludes VATMay 2025€360,264421 m
32 Cla� M�r, Old Monivea Road, Ballybritprice excludes VATMay 2025€440,749421 m
28 Cla� M�r, Old Monivea Road, Ballybritprice excludes VATMay 2025€421,586421 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 January 2023
  2. Decision due2 March 2023
  3. Decision issued21 February 2023
  4. Grant issued28 March 2023
  5. Permission expiry27 March 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.