Planning Permission Ireland
GrantedOtherDecided 1 August 2024

Corrib Village, Newcastle, Galway

Demolition of a substandard boat house and construction of a replacement two-storey boat house in Newcastle, Galway.

2360159 · Galway City Council · Lodged 12 December 2023

Reference
2360159
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
12 December 2023

Summary

AI-generated

The project at Corrib Village involves the demolition of an existing substandard boat house. It will be replaced with a new two-storey boat house featuring a repair dry dock on the ground floor, a first-floor club house meeting room, a cantilevered quayside boardwalk with floating pontoons, and a viewing deck.

Otherboat housedemolitionwaterfront
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development which consists of the demolition of a substandard boat house and the construction of a replacement two storey boat house building accommodating a repair / working dry dock inlet at the ground floor and a club house meeting room, kitchenette, w. C. And changing areas at the first floor, a cantilevered quayside boardwalk with floating pontoons at ground level and viewing deck to the water front at first floor and all associated site works

Land-use zoning

What this land is zoned for

Recreation and AmenityOS
To provide for recreational and amenity uses

National zoning type: Open space, park

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Carrick, 42 Upper Newcastle, GalwayMay 2025€805,000233 m
73a Upper Newcastle Rd, Galway, Co GalwayJul 2025€640,000293 m
7 Sylvan Close, Fairlands Park, NewcastleOct 2025€625,000313 m
6 Gort Ciuin, Moyola Park, NewcastleMay 2026€379,000402 m
Ceann Scribe, An Boithrin, 51 Upper NewcastleAug 2025€430,555443 m
34 Moyola Park, Newcastle, GalwayAug 2025€545,000453 m
31 Upper Newcastle, Newcastle, GalwayNov 2025€595,000468 m
22 Moyola Park, Newcastle, GalwayMay 2025€600,000483 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 December 2023
  2. Further information requested12 February 2024
  3. Further information received10 May 2024
  4. Decision due6 August 2024
  5. Decision issued1 August 2024
  6. Grant issued12 September 2024
  7. Permission expiry11 September 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.