Planning Permission Ireland
GrantedInfrastructureDecided 2 October 2024

Atlantic Technological University Galway Campus, Murrough, Dublin Road Galway

Construction of a new 5,550 sqm STEM building at the Atlantic Technological University Galway Campus.

2460260 · Galway City Council · Lodged 16 August 2024

Reference
2460260
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
16 August 2024

Summary

AI-generated

The proposed development consists of a new STEM building incorporating the schools of science, computing, and engineering. The building will feature lecture theatres, laboratories, offices, roof-level solar panels, and link bridges to existing campus buildings.

Infrastructureeducationsolaruniversity
Floor area
5,550 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development which consists of; planning permission is sought by the atlantic technological university for development on a site extending to 0.48 hectares located on the atlantic technological university galway campus, murrough, dublin road, galway, h91 t8nw. The proposed development will consist of the following
  • The construction of a stem building incorporating the schools of science and computing and the school of engineering with a gross floor area of 5,550 sqm comprising lecture theatres, laboratories, informal education spaces, group work areas, seminar rooms, meeting rooms and office space. The proposed building is located to the east of the campus addressing the ballybane road (r865)
  • The proposed building is attached to the existing school of engineering and school of science building at ground floor level and 2 no. Link bridges at first floor level
  • The provision of photovoltaic panels and plant area at roof level of the proposed building
  • The construction of a standalone transformer area, gas bottle zone and gas skid to the south of the proposed stem building
  • Alterations to the existing service road, diversion of services, enhanced access connections and the provision of a new platform lift to provide disabled access from the existing car park
  • Provision of hard and soft landscaping including a new landscaped zone to the east of the proposed building, bicycle and cargo parking, 4 no. Disabled car parking spaces and 5 no. Ev charging spaces, public lighting, signage and all associated site works and ancillary services necessary to facilitate the proposed development

Land-use zoning

What this land is zoned for

Community Culture and InstitutionalCI
To provide for institutional and community facility use

National zoning type: Community facilities

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Unit 97 Glasan Student Village, Ballybane Rd, MervueMay 2025€252,00098 m
Gmit Chaplain Rivevora Lo, Ballybane Rd, GalwayJul 2025€615,000125 m
Unit 155 Glasan Student Village, Ballybane Road, MervueFeb 2026€245,000125 m
Unit 154 Glasan Student Village, Ballybane Road, MervueJul 2025€240,000127 m
Unit 7 Glasan Student Village, Ballybane Rd, MervueJan 2026€225,000133 m
Unit 1 Glasan Student Village, Ballybane Rd, MervueJul 2025€210,000133 m
Unit 5 Glasan Student Village, Ballybane Rd, MervueFeb 2026€200,000133 m
Unit 4 Glasan Student Village, Ballybane Rd, MervueSept 2025€200,000133 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 August 2024
  2. Decision due10 October 2024
  3. Decision issued2 October 2024
  4. Grant issued8 November 2024
  5. Permission expiry7 November 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.