Existing Cashla-Salthill 110kV overhead line (OHL), in the townlands of, Ballybaan Beg Parkmore and Castlegar
Uprating works to the existing Cashla-Salthill 110kV overhead power line in Galway City.
2560012 · Galway City Council · Lodged 20 January 2025
- Reference
- 2560012
- Authority
- Galway City Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 20 January 2025
Summary
AI-generatedThe development consists of infrastructure works to uprate a section of the Cashla - Salthill 110kV overhead line. Works within Galway City include restringing conductor wires, strengthening tower foundations, replacing polesets, and replacing insulating hardware.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for development which consists of; works to uprate the existing cashla – salthill 110kv overhead line (ohl). Within galway city the proposed development is located in the following townlands: bally baan beg, parkmore and castlegar. The proposed development will consist of works to a section of the cashla – salthill 110kv ohl between angle mast 52 (am52) in claregalway and end mast 105 (em105) near galway 110kv substation, galway city. Approximately 1.7km of the existing ohl circuit is located within the functional area of galway city council with approximately 7.7km in the functional area of galway county council. A separate planning application is being lodged with galway county council. The proposed development within galway city will comprise: - the replacement (“restringing”) of the existing ohl circuit conductor wires with a new higher capacity conductor; - retain towers at 6no. Locations including foundation strengthening with bar member replacement at 3 locations; - replace polesets at 1no. Location; - the replacement of insulating and ancillary hardware at structures; - replacement of line droppers at galway 110kv substation; - all associated temporary site development works to gain access to the existing structures including vegetation clearance and management, disassembly and reassembly of gate posts / piers and removal and reinstatement of existing fencing; and - other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, vegetation clearance and management, stone tracks, ground protection mats, infrastructure crossing support systems (i. E. Guard poles) and temporary watercourse crossings. Where required, an aerial catenary stringing system (acss) will be used to facilitate stringing operations over major obstacles, e. G. Busy national roads, wide rivers, etc.
Land-use zoning
What this land is zoned for
“To provide for low-density residential development which will ensure the protection of existing residential amenity and environmental sensitivities”
National zoning type: Residential, mixed residential and other uses
Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 33 Bothar Na Mine, Kinvaraprice excludes VAT | Sept 2025 | €396,500 | 461 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received20 January 2025
- Further information requested28 February 2025
- Further information received2 May 2025
- Decision due26 June 2025
- Decision issued4 June 2025
- Grant issued18 July 2025
- Permission expiry17 July 2030
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Permission for development which consists of: permission is sought to erect 4 no. 2 storey detached dwelling…
An Phairc Mhor , Parkmore Castlegar , Galway
2560289Galway CityLodged 18 Sept 2025Housing estate
- Granted50 m away
Permission for retention which will consist of alterations to dwelling house
3 Church Avenue , Castlegar , Tuam Road
22118Galway CityLodged 9 May 2022Retention
- Granted50 m away
Permission for the construction of a serviced dwelling house and domestic garage together with ancillary…
Castlegar , Tuam Road , Galway
18385Galway CityLodged 29 Nov 2018New dwelling
- Granted60 m away
Permission for development which will consist of alterations and extension to an existing two storey dwelling…
Parkmore , Castlegar , Galway
21271Galway CityLodged 20 Aug 2021Extension
- Granted60 m away
Permission for development which consists of; (1) alterations and construction of an extension to existing 2…
Parkmore , Castlegar , Galway
2460420Galway CityLodged 23 Dec 2024New dwelling
- Granted60 m away
Permission to construct a housing development comprising of the following (1) Retention of existing dwelling…
Castlegar , Tuam Road , Galway
17222Galway CityLodged 4 Aug 2017Housing estate
- Granted70 m away
Full Planning permission consequent to the grant of outline permission Pl. Ref 17/222, for the construction…
Castlegar , Tuam Road , Galway
19284Galway CityLodged 11 Oct 2019New dwelling
- Granted80 m away
Permission for development which will consist of the construction of a two-story serviced dwelling house and…
Parkmore , Castlegar , Galway
2218Galway CityLodged 10 Feb 2022New dwelling
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedInfrastructure
For the proposed development within County Galway will comprise — the replacement (“restringing”) of the…
Cahergowan Summerfield Claregalway Ballygarraun Pollkeen , Cloon Cloonacauneen Pollaghrevagh & Cappanabornia
2560052galwayLodged 20 Jan 2025
- GrantedInfrastructure
EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply for…
Existing Cashla - Dalton 110kV overhead power line , Dalgan Demesne Pollbaun Carrowbeg West Gorteens Seefin Brookhill Carrowmore Ballyhankeen Rushbrook East Ballycusheen Scardaun West Millbrook Milford Demesne Curraghadooey Lisduff Rathgranagher (Mil
2560709MayoLodged 9 Oct 2025
- GrantedInfrastructure
To upgrade the existing 220k overhead line between the existing Cashla 220kV Substation in the townland of…
Cashla Substation & Overhead Transmission Line , Barrettspark and , Oughtagh
23355galwayLodged 29 Aug 2023
- GrantedInfrastructure
To refurbish the existing Castlebar-Cloon 110kV overhead line, which is approximately 57km long, and…
Cloonascragh ,
221030galwayLodged 7 Sept 2022
- GrantedInfrastructure
For works associated with the refurbishment of the existing Moneypoint — Oldstreet 400 kV overhead line…
Ballyhanry to Abbeyville ,
161747galwayLodged 22 Dec 2016
- GrantedInfrastructure
The existing Bandon to Dunmanway 110 kV Overhead Line (OHL), which is approximately 26km long between the…
Acres, Aghalinane, Ballyhalwick,Balteenbrack, , Behagh, Caher, Carhoon West, Castlelands, Derrycoo, Gortnamucklagh, Gurteen, Gurteenroe, Kilnacranagh, Lissacroneen, Mallowgaton, Mishells, Murragh, Roug
23654corkLodged 17 Nov 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.