LARHA, ASTEE, LISTOWEL
Extension of the operational lifespan of a permitted wind farm in Astee from 20 to 25 years.
1640 · Kerry County Council · Lodged 20 January 2016
- Reference
- 1640
- Authority
- Kerry County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 20 January 2016
Summary
AI-generatedPermission is sought to modify the operational period of a previously permitted wind farm. The applicant wants to extend the allowed lifespan of the wind farm from 20 years to 25 years.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Modify the operational period of the permitted wind farm under planning register no 08/2500 and 15/679 from a period of 20 years to a period of 25 years
Key dates
Timeline
- Application received20 January 2016
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted200 m away
EXTEND THE OPERATIONAL LIFE OF THE EXISTING WIND FARM FROM 20 TO 25 YEARS, AND FOR THE CHANGE OF USE OF AN…
LARHA , ASTEE , CO KERRY
171147KerryLodged 17 Nov 2017Energy
- Granted320 m away
FOR THE CONSTRUCTION OF TWO ELECTRICAL EQUIPMENT UNITS, ADJACENT TO THE EXISTING WIND TURBINES. THE…
LARHA , ASTEE , CO KERRY
17653KerryLodged 7 Jul 2017Energy
- Granted450 m away
FOR THE CONSTRUCTION OF TWO ELECTRICAL EQUIPMENT UNITS, ADJACENT TO THE EXISTING WIND TURBINES. THE…
TULLAHENNELL NORTH , ASTEE , CO KERRY
17652KerryLodged 7 Jul 2017Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
EXTEND THE OPERATIONAL LIFE OF THE EXISTING WIND FARM FROM 20 TO 25 YEARS. THE PERMISSION RELATES TO THE…
TULLAHENNEL NORTH , ASTEE , CO KERRY
171148KerryLodged 17 Nov 2017
- GrantedEnergy
Erection of 1 no. 500 KW wind turbine (hub height 45 metres), construction of a 25 square metre electrical…
Kilpatrick, Bandon, Co.Cork,
174630corkLodged 16 Mar 2017
- GrantedEnergy
EXTENSION OF DURATION of Planning file ref: 14/600108 for erection of a wind turbine with rotor diameter not…
Beallough , Portlaw , Co Waterford
215WaterfordLodged 8 Jan 2021
- GrantedEnergy
CONTINUE USE OF EXISTING WIND FARM GRANTED UNDER PLANNING REF 06/1489 AND 06/91489 FOR A FURTHER PERIOD OF…
COOLLEGREAN , BROSNA , CO KERRY
171193KerryLodged 29 Nov 2017
- GrantedEnergy
To Extend the Appropriate Period of Planning Permission P09/123 for proposed development which will consist…
Crossmore Wind Farm , Knockalough , Co. Clare
19388ClareLodged 16 May 2019
- GrantedEnergy
Construction of 2 no. wind turbines with tip height up to 150.5m, control building, 100m wind monitoring mast…
Rathnacally, Charleville, ,
124446corkLodged 9 Mar 2012
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.