Planning Permission Ireland
GrantedCommercialDecided 20 September 2019

KENMARE SERVICE STATION, KILLOWEN ROAD, KENMARE

Redevelopment of Kenmare Service Station including demolition of existing structures and building a new retail shop.

19805 · Kerry County Council · Lodged 29 July 2019

Reference
19805
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
29 July 2019

Summary

AI-generated

The project involves the demolition of the existing shop unit, fuel pumps, sheds, and car wash facilities. A new service retail building of 330.7 sqm will be constructed, featuring a retail sales area, off-license, deli, seating area, and 2 new fuel pump islands.

Commercialpetrol stationdemolitionretail
Floor area
331 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will consist of the redevelopment of existing service station to include the following: (1) the demolition of existing shop unit with steel lean-to shed at rear, fuel pumps with canopy over, 2 no. Timber sheds, portable toilet, car wash, car valeting canopy, compressor enclosure and steel container, (2) construction of new service retail building with a total gfa of 330.7sp. M incorporating retail sales area of 100 sqm which includes an off-license area of 12 sqm, along with deli/sandwich bar 65sqm seating area 20 sqm, toilets/staff facilities and store room, (3) 2 no. Fuel pump islands with canopy over, (4) refuse/ storage compound, (5) underground hydrocarbon inceptor, (6) modification of existing access/egress to the site from the public road, (7) advertising logo and branding to building, and canopy, (8) provision of 20 no. Car parking spaces with all associated site works and boundary treatments

Land-use zoning

What this land is zoned for

Built up AreaRV
Existing built areas of mixed use.

National zoning type: Built up area

Objective set by the Kenmare Municipal District Local Area Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
4 Killowenbeg, Killowen Rd, KenmareJul 2025€490,00045 m
Golf Link House, Killowen, Kenmarenot full market priceMay 2026€140,000168 m
5 Hazelgrove, Killowen, KenmareMar 2025€227,500169 m
Corrigatee, Killowen Rd, Kenmarenot full market priceMay 2026€257,000210 m
1 Oakwood Manor, Kenmare, KerryMay 2025€465,000226 m
19 Oakwood Manor, Kenmare, KerryApr 2026€460,000287 m
34 Oakwood Manor, Killowen, KenmareApr 2026€320,000324 m
Killowen, Kenmare, KerryJun 2026€1,650,000373 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 July 2019
  2. Decision due22 September 2019
  3. Decision issued20 September 2019
  4. Grant issued3 February 2020
  5. Appeal submitted17 October 2019
  6. Appeal decided3 February 2020
  7. Permission expiry2 February 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.