existing Lidl Licensed Foodstore, Tralee Road (N22) / Bóthar Hans Liebherr (N72), Townland of Derreen Killarney Co. Kerry

Demolition of the existing Lidl foodstore in Killarney to build a larger, new Lidl store.

2460991 · Kerry County Council · Lodged 18 December 2024

Reference
2460991
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
18 December 2024

Summary

AI-generated

Permission is sought to demolish the existing 1,787.6 sq m single-level Lidl foodstore. In its place, a new, larger single-level mono-pitched Lidl store of 2,631.5 sq m gross floor space will be constructed with ancillary infrastructure.

Commercialsupermarketdemolitionredevelopment
Floor area
2,632 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Lidl ireland gmbh intends to apply for permission for development comprising the demolition of the existing single level lidl licensed discount foodstore (1,787.6 sq m gross floor space) and the construction of a new single level mono-pitched licensed discount foodstore with ancillary infrastructure and associated site development works (all totalling 2,631.5 sq m gross floor space and ranging in height equivalent from 1 to 2 storeys), at this site of approximately 0.941 hectares located at the existing lidl licensed foodstore, tralee road (n22) / bóthar hans liebherr (n72), townland of derreen, killarney, co. Kerry. The development will consist of: the demolition of the existing single level lidl licensed discount foodstore building (1,787.6 sq m gross floor space) with net retail floor space of 1,245 sq m; the construction of a new single level mono-pitched licensed discount foodstore (2,517sq m gross floor space) with net retail floor space of 1,670 sq m to include an ancillary off-licence use and bakery, an entrance pod, public facilities (incl. Lobby and toilets), staff facilities (incl. Welfare lobbies, toilets, cloak/change rooms, staff canteen, meeting room and operational office), it room, plant room, delivery area and storage (incl. Cold storage), and external covered trolley bay area with 8 no. Long term bicycle parking spaces; rooftop photovoltaic solar panel array totalling 840 sq m; corporate signage (3 no. Building mounted corporate internally illuminated signs, 3 no. Wall mounted externally illuminated poster panel display boards, 1 no. Externally illuminated poster display board and 1 no. Free standing internally illuminated flagpole sign at primary vehicular and pedestrian entrance); 92 no. Surface car parking spaces (5 no. Disabled, 4 no. Parent and child, 2 no. Ev charging, 17 no. Ev, and 64 no. Regular); 28 no. Bicycle parking spaces (8 no. Long-term undercover and 20 no. Short-term uncovered); boundary treatments, retaining walls, hard and soft landscaping , services (incl. Site drainage accommodation works and underground surface water attenuation storage), and all other ancillary infrastructure (incl. Esb substation and switch room building of 24.5 sq m gross floor space) and associated site development works above and below ground level. Primary vehicular and pedestrian access to the proposed new licensed discount foodstore development will be provided via the enhancement of the existing vehicular and pedestrian access from bótha

Land-use zoning

What this land is zoned for

Built up AreaRV
Existing built areas of mixed use

National zoning type: Built up area

Objective set by the Kerry County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 23, Rock Road, Reeks GatewayFeb 2025€300,000136 m
No 5 Killarney Reeks Gateway, Killarney, KerryOct 2025€430,000144 m
7 Bruach Na Habhainn, Tralee Road, KillarneyJan 2026€388,000237 m
St Margarets Rd, Killarney, KerryOct 2025€650,000277 m
33 Bruach Na Habhann, Killarney, Co KerryApr 2025€349,350315 m
25 Elm Grove, Killarneynot full market priceNov 2025€130,200339 m
13 Allmans Terrace, Rock Rd, Killarneynot full market priceSept 2025€75,000343 m
21 Millwood, St Margarets Rd, KillarneySept 2025€440,000369 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 December 2024
  2. Further information requested20 February 2025
  3. Further information received14 August 2025
  4. Decision due23 September 2025
  5. Decision issued23 September 2025
  6. Grant issued28 October 2025
  7. Permission expiry27 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.