Planning Permission Ireland
GrantedRetentionDecided 13 February 2026

The Dingle Distillery Old Mill, Milltown Co. Kerry V92 E7YD, (also drainage connection at Ballyhea Road Commons of Milltown Dingle Co. Kerry)

Retention of visitor facilities at Dingle Distillery and permission for partial demolition, expansion, and new silos.

2560068 · Kerry County Council · Lodged 10 February 2025

Reference
2560068
Authority
Kerry County Council
Register status
Decided
Type
RETENTION
Received
10 February 2025

Summary

AI-generated

This application seeks retention of a 183 sqm first-floor visitor area, shop, and kitchen. It also seeks permission for partial demolition, a 323 sqm upper-level expansion, changes of use to retail and industrial distilling, and two new 8.8m high steel grain silos.

Retentiondistilleryvisitor centresilos
Floor area
323 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(1) retain installed first floor area in distillery production building 183m2 consisting of: staff kitchen 12.7m2, shop with tasting bar 26.9m2; visitor area 143.4m2 (2) visitor centre use on site and planning permission for (1) partial demolition of single storey projecting elements on south side (103 sq. M. ) (2) upgrade / replacement of external cladding (including reconfiguration of openings) (3) internal layout modifications (4) additional 323 sq. M. At upper level (including visitor use) (5) change of use of 59 sq. M. Of lower level production area to retail (6) change of use of 12m2 of lower level production area to open office area (7) change of use from permitted storage (upper shed) 412m2 to proposed industrial use (distilling and ancillary storage) (8) new retail area at lower level 142m2 (9) two new (8.8m high) freestanding steel grain storage silos to front (10) connection of sewage system to mains (to replace septic tanks) (11) landscaping (12) bicycle, car and bus parking provision on site and all associated site ancillary works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Dunlavin House, Milltown, DingleAug 2025€910,000341 m
2 Ballyferriter Rd, Milltown, DingleOct 2025€600,000348 m
Apt 4 Watersedge, The Wood, DingleJun 2025€893,000372 m
4 Fearann Geal, Miltown, DingleNov 2025€825,000443 m
9 Radharc Na Mara, The Wood, DingleJan 2025€760,000452 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 February 2025
  2. Further information requested4 April 2025
  3. Further information received16 September 2025
  4. Decision due13 February 2026
  5. Decision issued13 February 2026
  6. Appeal submitted11 March 2026
  7. Appeal decided9 July 2026
  8. Permission expiry8 July 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.