Planning Permission Ireland
Awaiting decisionEnergyDecision was due 9 January 2026

Site in the Townlands of Lacka More Parkmore Lissireen Tullacrimeen Aulaneduff Ballyconnell, Fahavane Knockbrack West Knocknacaska and Knocknagun, County Kerry

A major solar farm development across 152.6 hectares in County Kerry.

2560875 · Kerry County Council · Lodged 26 September 2025

Reference
2560875
Authority
Kerry County Council
Register status
In progress
Type
PERMISSION
Received
26 September 2025

Summary

AI-generated

This application seeks a 10-year permission for a solar farm spanning approximately 152.6 hectares. The project includes 449,366 square meters of ground-mounted solar panels, 28 battery energy storage system containers, electrical skids, and associated infrastructure with an operational lifespan of 40 years.

Energysolarrenewablebessinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Rediii: the development will consist of: a 10-year permission for the development of a solar farm on an overall site of c. 152.6 hectares consisting of the following: c. 449,366 sq m of solar photovoltaic panels on ground mounted steel frames; 19 no. Hardstanding locations for electrical skids; new internal access tracks with passing bays; underground power and communications cables and ducts, including along the l-6507, r557, and l-2034 public roads, 3no. Horizontal directional drilling (hdd) locations associated with the underground cable route; a total of 5 no. Solar farm site entrances (1no. From the r557 public road, 3no. From the l-6507 public road and 1no. From the l-10562 public road); access gates; 5no. Temporary site compounds of c. 4,050 sq m each to be used for storage during construction activity; 28no. Battery energy storage system (bess) containers and 7no. Associated mv stations as well as associated cctv, bess compound fencing, gate, boundary fencing and all associated ancillary drainage development, site works and services. The solar farm will be operational for 40 years. A natura impact statement (nis) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application.

Key dates

Timeline

  1. Application received26 September 2025
  2. Decision due9 January 2026

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.