Rickardstown & Roseberry, Newbridge, Co. Kildare
Construction of 385 homes, a crèche, and public open space in Newbridge.
16975 · Kildare County Council · Lodged 14 September 2016
- Reference
- 16975
- Authority
- Kildare County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 14 September 2016
- Residential units
- 361
- Floor area
- 43393.4 m²
Summary
AI-generatedThe proposed development consists of 385 dwellings, including 327 two-storey houses, 48 duplex units, and 10 townhouses. The scheme also includes a two-storey crèche, over 19,000 sqm of public open space, and associated site works. An Environmental Impact Statement has been prepared for this phased 7-year permission.
- Storeys
- 3
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
385 no. Dwellings and associated car parking (327 no. 2 storey 3/4 bed houses;48 no. 3-storey duplexes consisting of 24 no. 1 & 2 bed apartments and 24 no. 2 & 3 bed units, 6 no. 2-storey 2-bed townhouses and 4 no. 3-storey 3-bed townhouses) totallying 44,473 sqm gross floor area. The proposed development also includes 1 no. 2-storey crèche building (541 sqm) and associated parking; 19,449 sqm of public open space; associated internal road network; public lighting; surface water attenuation; landscaping and all associated site clearance/demolition and site development works and connections to site services. An environment impact statement has been prepared in respect of the planning application. Planning permission is sought for a period of 7 no. Years to allow for development on a phased basis. The site measures approximately 13.1 ha (12.8 ha developable area) and is bounded by sexes road to the south; "roseberry hill" to the southeast; mooney's road to the north; rickardstown house to the northwest; and station road to the west. The application site is proposed to be accessed from station road and via roseberry hill. As revised by significant further information: the main changes include but are not limited to a reduction in the number of proposed dwellings from 385 no. To 364 no. ; the removal of all duplex/apartment units and replacement with houses; revisions to overall layout, house types, design and mix including an increase in the number of 2 no. Bedroom houses; increase in the amount and design of open space; alterations to boundary treatments; road improvements including changes to road design; changes to car parking; relocation and redesign of proposed crèche; revised landscaping; and other information to assist the authority in making its decision. The revised scheme retains the proposed northern portion of the site and the proposed access onto station road.
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 259 Station Walk, Rickardstown, Newbridge | May 2026 | €451,000 | 65 m |
| 40 Roseberry Hill, Newbridge, Kildare | Dec 2025 | €552,000 | 83 m |
| 227 Station Walk, Station Road, Newbridgeprice excludes VAT | Mar 2025 | €422,907 | 108 m |
| 162 Roseberry Hill, Newbridge, County Kiildare | Mar 2026 | €495,000 | 138 m |
| 307 Station Walk, Rickardstown, Newbridgeprice excludes VAT | Feb 2025 | €449,339 | 154 m |
| 111 Roseberry Hill, Newbridge, Kildare | Dec 2025 | €420,000 | 154 m |
| 345 Station Walk, Rickardstown, Newbridgeprice excludes VAT | Apr 2025 | €418,502 | 159 m |
| 110 Roseberry Hill, Newbridge, Kildare | Jun 2026 | €405,000 | 165 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received14 September 2016
- Further information requested8 November 2016
- Further information received8 June 2017
- Decision due2 August 2017
- Decision issued2 August 2017
- Grant issued26 January 2018
- Appeal submitted4 September 2017
- Appeal decided26 January 2018
- Permission expiry25 January 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted90 m away
Full planning permission to construct a single storey extension to the rear and side of existing dwelling and…
114 Roseberry Hill , Newbridge , Co Kildare
17653KildareLodged 2 Jun 2017Extension
- Granted110 m away
To construct a single storey extension to the rear and side of existing dwelling house and all ancillary site…
45 Roseberry Hill , Newbridge , Co. Kildare
171177KildareLodged 23 Oct 2017Extension
- Granted240 m away
Retention and completion of non-compliant works to 45 no. houses currently being constructed under planning…
Townlands of Rickardstown and Roseberry , Newbridge , Co. Kildare
211216KildareLodged 24 Aug 2021Retention
- Granted290 m away
The increase in child numbers from a maximum of 54 children to (i) 75 children in full day care service or…
Roseberry Hill , Rickardstown , Newbridge
221285KildareLodged 28 Oct 2022Commercial
- Granted300 m away
For a single storey rear and side extension with pitched roof over for extended living accommodation
193 Roseberry Hill , Roseberry , Newbridge
24171KildareLodged 22 May 2024Extension
- Granted320 m away
Amendments to granted planning permission Ref. 16/975, ABP Ref. PL09.249158 to include: Previously granted…
Rickardstown and Roseberry Townlands , Newbridge , Co. Kildare.
201284KildareLodged 28 Oct 2020Housing estate
- Granted330 m away
For the construction of 17 no. residential dwellings comprising 4 no. 4-bed semi-detached 2 storey dwellings,…
Rickardstown , Newbridge , Co. Kildare
2460446KildareLodged 21 May 2024Housing estate
- Refused360 m away
Development will consist of the demolition of an existing single story dwelling and general site clearance…
Rooske Lodge , Roseberry Hill , Newbridge
2244KildareLodged 19 Jan 2022Apartments
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedHousing estate
The proposed development will consist of a largescale residential development (LRD), comprising of 134no.…
Ross Road , Killarney , Co. Kerry
2560682KerryLodged 6 Aug 2025
- GrantedHousing estate
The development will consist of revisions to development previously permitted under Ref No. 05/54023,…
Meadowlands, Kilnagurteen, Masseytown, Co.Cork,
145160corkLodged 3 Jun 2014
- GrantedHousing estate
The proposed development comprises a residential scheme of 96 no. dwelling units in a mixture of 2 storey and…
Southgreen Road (Hill Road) , Old Road and Dunmurray Raod , South Green Kildare Town
181028KildareLodged 23 Aug 2018
- GrantedHousing estate
The provision of 195 No. dwellings, comprising 1 No. 5 bedroom two-storey detached house; 22 No. 4/5 bedroom…
Site in the townland of Easton , off Green Lane , Leixlip
16282KildareLodged 21 Mar 2016
- RefusedHousing estate
Large Scale Residential Development at a site of c.10.3ha. The development lands are located to the north of…
Ruanbeg , Townlands of Kildare & Collaghknock , Glebe
23510KildareLodged 12 May 2023
- GrantedHousing estate
For the construction of 17 no. residential dwellings comprising 4 no. 4-bed semi-detached 2 storey dwellings,…
Rickardstown , Newbridge , Co. Kildare
2460446KildareLodged 21 May 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.