Planning Permission Ireland
GrantedAlterationsDecided 24 January 2018

Thomastown, Enfield, Co. Kildare

Amendments to a previously approved dormer dwelling in Enfield.

171192 · Kildare County Council · Lodged 25 October 2017

Reference
171192
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
25 October 2017
Residential units
1
Floor area
267.9 m²

Summary

AI-generated

Permission is sought for amendments to a previously approved dormer dwelling. Changes include reducing the setback from the public road from 211m to 30.4m, reducing the floor area from 337.6 sqm to 267.9 sqm, omitting a side utility room, and minor elevational changes.

Alterationsamendmentone off houserural

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Amendments to development previously approved under planning register reference 16/660 for a storey and a half / dormer type dwelling to include the following; revised location of proposed dwelling on family landholding from the approved set back distance of 211m to a reduced set back distance of 30.4m measured from the public road, reduction in floor area from 337.6sqm to 267.9sqm, omission of single storey utility room to side, minor elevational amendments, and all associate site works (note that the location of the "aquamax" waste water treatment system and sand polishing filter will remain as approved under planning register reference 16/660)

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 August 2018. A completion certificate was lodged on 3 April 2020.

Notified floor area: 267.9

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 October 2017
  2. Further information requested14 December 2017
  3. Further information received22 December 2017
  4. Decision due27 January 2018
  5. Decision issued24 January 2018
  6. Grant issued6 March 2018
  7. Permission expiry5 March 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.