Planning Permission Ireland
GrantedAgriculturalDecided 23 October 2017

Mullaboden, Ballymore Eustace, Co. Kildare

Construction of an equine breeding centre and farm buildings in Ballymore Eustace.

17858 · Kildare County Council · Lodged 27 July 2017

Reference
17858
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
27 July 2017

Summary

AI-generated

Planning permission is sought to construct an equine breeding centre and farm yard buildings consisting of four blocks around a central courtyard. This includes stables, a horse walker, cattle shed, machinery storage, and associated effluent treatment.

Agriculturalequinestablesagriculture

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • To construct an equine breeding centre and farm yard buildings. The development will consist of 4 no. Blocks arranged around a central courtyard. Block 1 will consist of a covered horse walker and lunge ring. Block 2 will consist of 14 no. Stables with wash bay, vet room, tack room and hay/feed store at ground floor and an office space over one half section at first floor. Block 3 will consist of 6 no. Stables to one side with cattle shed to the other with overhang roof. Block 4 will consist of a hay store and machinery storage barn. Permission also sought for
  • (a) to construct a covered muck heap storage area. (b) to construct an underground soiled water holding tank. (c) a secondary effluent treatment system with a sand filter percolation area to serve the proposed facility. (d) to relocate and upgrade the existing farm entrance approx. 12m to the north of its existing location for the purpose of improving sight lines. (e) lay an access roadway from the public road to the farm yard which is located immediately after the existing stream which traverses the land. (f) to carry out land drainage work on the field adjacent to the roadway by the laying of a 225 pipe diameter from the proposed new entrance to the stream with herring bone minor drains feeding into main drain

Key dates

Timeline

  1. Application received27 July 2017
  2. Further information requested20 September 2017
  3. Further information received26 September 2017
  4. Decision due23 October 2017
  5. Decision issued23 October 2017
  6. Grant issued30 November 2017
  7. Permission expiry29 November 2022

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.