The Maltings, Athy, Co. Kildare.
Demolition of storage buildings and construction of a new malting plant and energy facilities.
18479 · Kildare County Council · Lodged 27 April 2018
- Reference
- 18479
- Authority
- Kildare County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 27 April 2018
Summary
AI-generatedA 10-year planning permission is sought for the demolition of existing storage and barley intake buildings to construct a new malting plant. The new facilities will include an energies building, kiln vessel, steeps building, germination vessels, combined heat and power units, and a barley intake building.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A 10 year planning permission for development which will consist of: (1) the demolition of a portion of an existing barley intake building and storage building; (2) the construction of a new malting plant comprising: an energies building (400.5 sqm and 16.6 metres high); a kiln vessel (594 sqm and 10.8 metres high); a steeps building (496.6 sqm and 20.4 metres high); 2 no. Germination vessels (830 sqm and 10.2 metres high); a 300 cubic metre process water tank (5.7 metres high); and ancillary overhead conveyors at 11.5 metres above ground level: (3) the construction of a wastewater balance tank (167.3 sqm and 5.7 metres high): (4) the construction of 3 no. Combined heat and power units (228 sqm and 7.4 metres high): (5) the construction of a barley intake building (145.7 sqm and 18 metres high); (6) the construction of a heat recovery unit for the boby kiln to be located on top of the existing boby tower (162 sqm) to a height of 21.6 metres above ground level; (7) the construction of a filter enclosure (60.7 sqm and 14 metres high); (8) the construction of a malt screen housing (65 sqm and 18.0 metres high); (9) the construction of a malt outloading structure with overhead storage bins (174.3 sqm and 23 metres high) with associated overhead conveyors; (10) 2 no. Buffer bins (50 sqm and 20.7 metres high); (11) the renovation of plewman’s house and the construction of a 76sqm board room extension and a 310 sqm administration building extension; (12) the construction of a 29 no. Space car park with disabled and electric charging spaces adjacent to plewman’s house; (13) the construction of an access road, footpath and vehicle entrance from the woodstock industrial estate road; (14) an upgraded surface water management system to include a new surface water attenuation pond; 1 no. Surface water screen; 1 no. Hydrodynamic grit separator; and 1 no. Hydrocarbon interceptor; and (15) all other site development works including the provision of ancillary access roads, hardstands, conveyors and underground services required to facilitate the development. An environmental impact assessment report (eiar) and natura impact statement (nis) will be submitted to the planning authority with the application and the eiar and nis will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority, for development
Land-use zoning
What this land is zoned for
“To provide for and facilitate the provision of high job-generating uses.”
National zoning type: Industrial, enterprise, employment
Objective set by the Athy Local Area Plan 2021 - 2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 27th Lockhouse, Athy, Co Kildare | Dec 2025 | €196,000 | 210 m |
| 3 The Harbour, Nelson Street, Athy | Dec 2025 | €193,000 | 211 m |
| Apt 38 Block A, The Harbour, Nelson St | May 2026 | €200,000 | 211 m |
| Apt 21 Block A, The Harbour, Nelson St | Jun 2026 | €210,000 | 211 m |
| Apt 39 Block A, The Harbour, Nelson St | Jun 2026 | €209,000 | 211 m |
| Apartments 1-7, Nelson Street, Athy | Feb 2026 | €1,550,000 | 234 m |
| Apartment 1, 11 Lower William Street, Athy | Jan 2026 | €118,750 | 235 m |
| Apartment 3, 11 Lower William Street, Athy | Jan 2026 | €118,750 | 235 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received27 April 2018
- Further information requested21 June 2018
- Further information received1 August 2018
- Decision due25 September 2018
- Decision issued29 August 2018
- Appeal submitted25 September 2018
- Appeal decided14 March 2019
- Permission expiry13 March 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
The construction of a malt production process building (Nordon Steeps Building) along the north eastern…
The Maltings , Athy , Co. Kildare.
191024KildareLodged 13 Sept 2019Industrial
- Granted100 m away
Demolition of existing canteen building and 2 no. Barley storage silos (10.5 m diameter x 14 m high) and…
Minch Malt , Upper William Street , Athy
2460266KildareLodged 28 Mar 2024Industrial
- Granted100 m away
Construct two grain storage silos and associated site works
The Maltings , Kilkenny Road , Athy
1641KildareLodged 21 Jan 2016Agricultural
- Granted140 m away
For the development consisting of an energy decarbonisation project that will include the installation of…
The Maltings , Athy , Co. Kildare
2349KildareLodged 23 Jan 2023Energy
- Granted140 m away
For the following works; 2-storey garage/bedroom extension to side of dwelling, conversion of attic to…
St Annes , Upper William Street , Athy Co. Kildare.
211565KildareLodged 3 Nov 2021Retention
- Granted170 m away
The upgrade of part of the existing production building to include the following: (i) Removal of part of the…
Bleach Townland , Upper William Street , Athy
17240KildareLodged 7 Mar 2017Industrial
- Granted190 m away
Retention of an existing hardcore surface, erection of 2.4m high cage containing 2.3m2 floor space and…
Woodstock Industrial Estate , Kilkenny Rd , Athy
18906KildareLodged 26 Jul 2018Commercial
- Granted190 m away
For a 2.2m high metal fence and gate to the rear and side of existing industrial building and all ancillary…
Irish Lamp Recycling , Woodstock South Industrial Estate , Athy
181364KildareLodged 13 Nov 2018Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedIndustrial
Demolition of existing canteen building and 2 no. Barley storage silos (10.5 m diameter x 14 m high) and…
Minch Malt , Upper William Street , Athy
2460266KildareLodged 28 Mar 2024
- GrantedEnergy
PROTECTED STRUCTURE: The proposed development comprises a 10 year permission for works to facilitate the…
Guiness Brewery, bounded by James's Street, Victoria Quay, Watling Street and Steevens Lane, Dublin 8
WEB2472/24Dublin CityLodged 11 Nov 2024
- GrantedIndustrial
A 10-year permission for the development which will consist of the phased extension of the existing food…
Dew Valley Foods , Holycross Road Thurles , Co. Tipperary
2460987TipperaryLodged 18 Nov 2024
- GrantedEnergy
Development consists of an amendment of the planning permission granted under Reg. Ref. KA110826 (ABP Ref.…
Balrath Demesne , Balrath , Co. Meath
KA160943MeathLodged 30 Aug 2016
- GrantedIndustrial
A ten year planning permission is being sought for: (1) a single storey multi-purpose manufacturing, assembly…
Rivers Plassey Park Road , National Technology Park , Castletroy Co. Limerick.
181020LimerickLodged 19 Oct 2018
- Awaiting decisionIndustrial
(i) the construction of a new building of 881m2 to house 16 no. 3.8m diameter and 13.5m height malted grain…
Newstown Ardattin , Tullow , Co. Carlow
2460377CarlowLodged 26 Nov 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.