Planning Permission Ireland
RefusedHousing estateDecided 14 November 2019

Tomard, Athy, Co Kildare

Extension of duration for a 55-unit housing development in Athy.

191060 · Kildare County Council · Lodged 24 September 2019

Reference
191060
Authority
Kildare County Council
Register status
Decided
Type
EXTENSION OF DURATION
Received
24 September 2019

Summary

AI-generated

An extension of duration is sought for a previously permitted development of 55 residential units. The scheme comprises townhouses and apartments across multiple blocks, along with a new access road, bin storage, and parking.

Housing estatehousing estateapartmentsextension of duration
Residential units
55

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Extension of duration: 08/300023 & 14/804 housing development to include
  • (i) erection of 55 residential units comprising block a, a three storey building with 4 no. Three bedroom terraced houses on ground and first floor, 4 no. One bedroom apartments on 2nd floor over, block b, a three storey and two storey building with 4 no. Terraced three bedroom town houses with optional 4th bedroom ensuite and wardrobe on 2nd floor, 2 no. 2 bedroom own door apartments, one on ground floor and the other on first floor, block c1, a two storey building with 5 no. Terraced three bedroom town houses, block c2, a two storey building with 5 no. Terraced three bedroom town houses, block d1, a two storey building with 6 no. Terraced 2 bedroom town houses, block d2, a two storey building with 6 no. Terraced 2 bedroom town houses, block e, a three storey and two storey building with 13 no. Two bedroom apartments and 6 no. One bedroom apartments. (ii) new access road which will provide road access to zoned residential lands to the south. Road access to these lands shall be through the existing cois bhearu housing scheme located to the west of these lands. (iii) bin storage areas, bicycle parking, car parking and all associated site development works. All development to take place in the townland of tomard, athy. This development is located off the monasterevan road directly adjoins the athy-monasterevan rail line

Land-use zoning

What this land is zoned for

New ResidentialR1
To provide for new residential development.

National zoning type: New/proposed residential

Objective set by the Athy Local Area Plan 2021 - 2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12 Ard Bhearu, Cois Bhearu, Monisterevan Rd AthyJan 2025€300,000147 m
9 Bearu Mhor, Athy, KildareJan 2025€250,000150 m
7 Bhearu Mhor Chois Bhearu Athy, KildareMar 2025€313,300155 m
25 Ard Bhearu, Cois Bhearu, Monasterevin RdMar 2025€300,000183 m
24 Ard Bhearu, Cois Bhearu, AthyJun 2026€365,000192 m
2 Sli Bhearu, Cois Bhearu, AthySept 2025€320,000224 m
4 Cluain Bhearu, Monasterevin Road, AthyApr 2025€342,000235 m
1 Banta Na Bearu, Cois Bhearu, Monasterevin RdJan 2025€450,000247 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 September 2019
  2. Decision due18 November 2019
  3. Decision issued14 November 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.